Building details
Present-day data · provided by prospect.nyc. These figures describe the lot today, not in 2001 — building facts only, never owner names, unit lists or sales.
Activity by month
| Month | Pages |
|---|---|
| May 1990 | 1 |
| May 1992 | 1 |
| Mar 2000 | 1 |
| Jul 2000 | 1 |
| Mar 2002 | 1 |
| Aug 2000 | 1 |
| Sep 2001 | 2 |
| Aug 2006 | 1 |
| Oct 2001 | 1 |
| Jan 2002 | 2 |
| Feb 2002 | 1 |
| Jun 2002 | 1 |
| Jul 2002 | 1 |
| Sep 2002 | 4 |
| Nov 2002 | 4 |
| Jan 2003 | 3 |
| Dec 2002 | 1 |
| Mar 2003 | 1 |
| Sep 2009 | 1 |
| Nov 2009 | 1 |
| Mar 2010 | 1 |
| May 2010 | 1 |
| Jul 2010 | 1 |
| Jan 2011 | 1 |
| Jun 2011 | 1 |
Tests over time
Each dot is a day on which a test candidate page names that substance for this building; bigger dots mean more pages that day. Dates and substances are machine-extracted from the page, and a dot is a page, not a result.
Samples, readings and decisions over time
Candidates extracted by machine can misread scans. Dates, substances, values and labs below occur on the same page; their relationship is not established — a value shown is a number found on the page, not a confirmed reading. Verify the page.
| Date / source | Page candidates |
|---|---|
| New York Times article on 9/11 lead tests, post-2001 2001-09-14 · 2006-08-25 NYC-WTC_000153774 · p. 2 ↗ | asbestos, dust, lead Values found on the page: 70% Lab candidates: not extracted Stated limit / above or below: verify source page; not structured in this index. Machine-extracted · building match confidence 0.85 (how sure the index is that this page concerns this building) · verify |
Documents for this building
105 documents across 18 boxes, grouped by what each document is. Titles and summaries are machine-written; the page image is the authority.
Lab report · 6
Laboratory report for air quality testing conducted at 40 North Street in New York on September 26, 2001.
7 pages · 2001-09-11 – 2001-09-25 · Transportation, Dept. of · Box — · matched page 2Newspaper clipping discussing allegations that the City Department of Transportation covered up lead test results following the September 11 attacks.
4 pages · 2001-09-14 – 2006-08-25 · Environmental Protection, Dept. of · Box DEP Box 26 · folder “WORLD TRADE CENTER GONZALEZ” · test candidate pages · matched page 1Letter from a consulting firm submitting air and dust sample test results for [name] Tower to the Department of Health.
21 pages · 2002-01-08 – 2002-01-14 · Environmental Protection, Dept. of · Box DEP Box 33 · folder “450 NORTH END AVENUE Block:16 Lot: 221 BIN: 1085568 Tribeca Bridge Tow…” · matched page 1Letter forwarding independent consultant air and dust sample results for SouthBridge Towers showing negative re-test findings after asbestos cleaning.
17 pages · 2002-02-05 · Environmental Protection, Dept. of · Box DEP Box 36 · folder “80 GOLD STREET Block: 94 Lot: 1 - BIN: 1083348 90 Beekman Street, Buil…” · matched page 1A table of area air sample results collected on January 19, 2003, at the Mayor's Office of Operations located at 40 Broadway.
1 page · 2003-01-19 · Health and Mental Hygiene, Dept. of · Box — · matched page 1Log sheet or index page from the World Trade Center Gonzalez collection dated November 7, 2001.
7 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 26 · folder “WORLD TRADE CENTER GONZALEZ” · matched page 4Memo or letter · 70
Memo discussing a Commissioner's Order to clean WTC residue from a vacant building near the World Trade Center site.
9 pages · 2002-06-07 – 2002-06-10 · Environmental Protection, Dept. of · Box DEP Box 26 · matched page 5Correspondence regarding ID card access arrangements for analysts working at the 40 Worth Street building.
7 pages · 2002-07-10 · Environmental Protection, Dept. of · Box DEP Box 43 · folder “E-mails M. Gilsenan 2002” · matched page 1Letter from DEP Bureau of Environmental Compliance confirming the extension of contracts ROF-REM1, 2, and 3 for WTC vicinity cleanup through November 2002.
3 pages · 2002-09-06 · Environmental Protection, Dept. of · Box DEP Box 39 · folder “NO LICENSE AGREEMENTS” · matched page 1Memo confirming a letter to the Department of Transportation was sent to facilitate continued permit issuance.
2 pages · 2002-09-06 · Environmental Protection, Dept. of · Box DEP Box 42 · matched page 2Letter from DEP Bureau of Environmental Compliance confirming the extension of contracts ROF-REM1, 2, and 3 for WTC vicinity cleanup through November 2002.
4 pages · 2002-09-09 – 2002-11-30 · Environmental Protection, Dept. of · Box DEP Box 39 · folder “NO LICENSE AGREEMENTS” · matched page 1Header page from the Design and Construction department containing standard formatting codes.
18 pages · 2009-09-17 – 2011-06-13 · Environmental Protection, Dept. of · Box DEP Box 41 · folder “DDC Active Construction Project List” · matched page 11Official confirmation that DEP contracts for exterior building clean-up near the World Trade Center have been extended through September 2002.
1 page · no date extracted · Environmental Protection, Dept. of · Box DEP Box 11 · folder “DEP EXTERIOR CLEAN UP - Also See Building Lists #2” · matched page 1Memo submitting a proposed air sampling plan to commence on September 14, 2001, near the WTC hot zone.
8 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 26 · matched page 2Correspondence regarding extended DOT contracts and expediting permits for waste containers at 125 Cedar Street.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 43 · folder “E-mails M. Gilsenan” · matched page 2Inter-departmental memorandum requesting hydraulic review of a sanitary house connection drawing for the New York Exposition and Convention Center.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “N.Y. EXPOSITION & CONVENTION CENTER SANITARY HOUSE CONNECTIONS & STORM…” · matched page 2Memo approving proposed PVC drainage connections from the New York Exposition and Convention Center to the city storm sewer.
3 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “N.Y. EXPOSITION & CONVENTION CENTER SANITARY HOUSE CONNECTIONS & STORM…” · matched page 2Memo approving proposed 24-inch PVC connections to the city storm sewer for the New York Exposition and Convention Center in April 1985.
18 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “N.Y. EXPOSITION & CONVENTION CENTER SANITARY HOUSE CONNECTIONS & STORM…” · matched page 1Transmittal of engineering drawings for a low-level gravity house connection from the New York Exposition to the city interceptor.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “N.Y. EXPOSITION & CONVENTION CENTER SANITARY HOUSE CONNECTIONS & STORM…” · matched page 1Department of Environmental Protection comments regarding contractor responsibilities for maintaining existing sewers during utility relocation work.
4 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STA…” · matched page 3Department of Environmental Protection letter dated October 25, 1982, providing comments on revised plans for the World Trade Center river water intake relocation.
4 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STA…” · matched page 3Letter from the Port Authority dated October 4, 1982, responding to Department of Environmental Protection comments regarding the World Trade Center utility relocation.
4 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STA…” · matched page 1Department of Transportation bureau record listing agencies and officials involved in transportation planning for the World Trade Center area.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STA…” · matched page 1Cover sheet for the Lincoln Tunnel contract regarding rehabilitation of bridges over Dyer Avenue at West 37th, 38th, and 39th Streets.
8 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “LINCOLN TUNNEL CONTRACT NO. LT. 245, W.37, 38 39TH ST. BRIDGES OVER DY…” · matched page 2Department of Environmental Protection letter dated November 2, 1981, requesting additional information before reviewing plans for the Lincoln Tunnel bridge rehabilitation.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “LINCOLN TUNNEL CONTRACT NO. LT. 245, W.37, 38 39TH ST. BRIDGES OVER DY…” · matched page 2DEP letter to Port Authority requesting existing sewer information before reviewing plans for bridge rehabilitation.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “LINCOLN TUNNEL CONTRACT NO. LT. 245, W.37, 38 39TH ST. BRIDGES OVER DY…” · matched page 2Port Authority submits bridge repair drawings for West 34th through 39th Streets to DEP for review.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “LT - 268 LINCOLN TUNNEL N.Y. APPROACH REPAIR TO BRIDGE ON THE NY EXPWY…” · matched page 1Letter enclosing a signed agreement between DEP and a contractor regarding sewer work in the vicinity of 11th Avenue.
9 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Tunnel W. 33rd St. To w. 38TH ST” · matched page 9DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
3 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Tunnel W. 33rd St. To w. 38TH ST” · matched page 2Department letter providing technical comments on final contract drawings for the WTC tunnel project.
6 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Tunnel W. 33rd St. To w. 38TH ST” · matched page 3Department of Environmental Protection letter providing design review comments on tunnel project contract drawings, requesting pressure relief manhole details, existing sewer…
7 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Tunnel W. 33rd St. To w. 38TH ST” · matched page 3DEP Bureau of Sewers clarifies hydraulic review procedures and provides technical comments on proposed siphon design in tunnel.
6 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Tunnel W. 33rd St. To w. 38TH ST” · matched page 3Consultant submits meeting minutes documenting design resolutions and areas of agreement from July 2, 1987 coordination meeting.
3 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Tunnel W. 33rd St. To w. 38TH ST” · matched page 1DEP Bureau of Sewers correspondence regarding sewer relocation from West 33rd to West 38th Street.
1 page · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Tunnel W. 33rd St. To w. 38TH ST” · matched page 1Correspondence addressing departmental comments on the 60 percent design submission for the tunnel project.
6 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Tunnel W. 33rd St. To w. 38TH ST” · matched page 1Department letter providing feedback on sewer relocation design drawings and elevation datum requirements.
4 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Tunnel W. 33rd St. To w. 38TH ST” · matched page 3Internal memorandum inquiring whether the Bureau accepts the proposed siphon concept shown in the 60% submission drawings for the Westside Connection Project.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Tunnel W. 33rd St. To w. 38TH ST” · matched page 2Inter-office memorandum requesting review of hydraulic computations for the siphon and gravity sewer routing in the 60% submission.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Tunnel W. 33rd St. To w. 38TH ST” · matched page 1Letter stating DEP has no facilities in the project limits and jurisdiction lies with other departments.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Tunnel W. 33rd St. To w. 38TH ST” · matched page 2Letter confirming discussion on new column footings near existing sewers for the Park Avenue tunnel exits.
4 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Park Avenue Emergency Tunnel Exits - MANHATTAN” · matched page 4Letter requesting missing as-built drawings and load summaries for the Park Avenue emergency tunnel project.
4 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Cont. M - 54-186 Mitchel Square” · matched page 3Approval letter for sewer modification plans in Battery Park City with instructions for construction notification.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Rockefeller Laboratory E. 67th St.” · matched page 1Letter providing engineering comments on proposed catch basin removal and construction for the Route 9A modification project.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Rockefeller Laboratory E. 67th St.” · matched page 2Letter submitting plan sets for the Route 9A modification project and requesting a review meeting.
1 page · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Rockefeller Laboratory E. 67th St.” · matched page 1Letter providing engineering comments on proposed catch basin removal and construction for the Route 9A modification project.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Rockefeller Laboratory E. 67th St.” · matched page 1Memo outlining requirements for hydraulic analysis and profile views for a proposed sewer relocation project.
3 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Proposed Sewer Relocation in Conjunction with new Subway Interconnecti…” · matched page 2March 25, 1982 DEP memorandum from Engineering Review Section requesting a field inspection of the double barrel sewer at Pier 86.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “U.S.S. Intrepid Museum - Pier 86 W. 46 St. DRAWINGS” · matched page 2March 2, 1982 DEP letter responding to a building structure proposal over an existing sewer outfall at Pier 86.
4 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “U.S.S. Intrepid Museum - Pier 86 W. 46 St. DRAWINGS” · matched page 3Letter from Port Authority to DEP submitting revised drawings and schedules for relocating sewer lines at the Church Street underpass.
3 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “P.A WTC C-81, DEY St. Replacement Sewer (WTC-DEY ST UNDERPASS)” · matched page 1Letter from Port Authority enclosing five copies of a revised utility relocation plan for the Dey Street underpass project.
10 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “P.A WTC C-81, DEY St. Replacement Sewer (WTC-DEY ST UNDERPASS)” · matched page 1Letter from DEP Office of Legal Counsel enclosing an executed agreement regarding a sewer matter near 11th Avenue and West 33rd Street.
10 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “AMTRAK'S West Side Connection” · matched page 10Letter reporting broken infrastructure spilling sewage onto railroad tracks and requesting city action to correct the issue.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “AMTRAK'S West Side Connection” · matched page 2Correspondence requesting revisions to drawing BP-2 for the 7 World Trade Center sewer project plans.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Street Improvement No. 7 World Trade Center” · matched page 2Letter submitting revised pavement plans addressing catch basin placement and storm drainage connections at Vesey Street.
1 page · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Street Improvement No. 7 World Trade Center” · matched page 1Transmittal of revised pavement plans retaining existing catch basins and adjusting grates to meet proposed grades.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Street Improvement No. 7 World Trade Center” · matched page 1Memorandum from the Department of Transportation regarding proposed street improvements for No. 7 World Trade Center.
1 page · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Street Improvement No. 7 World Trade Center” · matched page 1Document header showing a suspense date of July 29, 1986 for an internal memorandum regarding the World Trade Center No. 7 project.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Street Improvement No. 7 World Trade Center” · matched page 2Fragmented internal document from DEP regarding the World Trade Center project with a July 29, 1986 date stamp.
1 page · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Street Improvement No. 7 World Trade Center” · matched page 1Department of Environmental Protection memo reviewing structural computations for a proposed sewer chamber, providing specifications for roof slab thickness and steel values.
4 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Connection, AMTRAK 10th Ave. Tunnel” · matched page 2Letter provides specific design comments regarding roof slab thickness and removable slab configuration requirements.
4 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Connection, AMTRAK 10th Ave. Tunnel” · matched page 2Letter from STV&K submitting omitted structural computations for a sewer chamber to the Department of Environmental Protection.
1 page · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Connection, AMTRAK 10th Ave. Tunnel” · matched page 1Letter from STV&K submitting revised drawings for utility work and structural computations for sewer chamber to DEP for review and approval.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Connection, AMTRAK 10th Ave. Tunnel” · matched page 1Letter from STV&K submitting revised utility and project drawings and sewer chamber computations to DEP, incorporating earlier department comments.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Connection, AMTRAK 10th Ave. Tunnel” · matched page 1Engineers enclose meeting minutes from a December 1983 coordination meeting between DOT and MTCCC regarding the project.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Connection, AMTRAK 10th Ave. Tunnel” · matched page 1Letter from engineers enclosing minutes of an October 11, 1983 meeting between NYC DOT and MTC.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Connection, AMTRAK 10th Ave. Tunnel” · matched page 1Permit application · 2
Attendance sheet from a meeting regarding World Trade Center debris cleanup operations held in September 2002.
25 pages · no date extracted · Environmental Protection, Dept. of · Box Asbestos - BOX 8 · folder “NO LICENSE AGREEMENTS” · matched page 1Form · 7
Formal proposal document dated May 6, 1992, outlining MEP engineering services provided by an architectural firm.
127 pages · 1992-05-06 · Citywide Administrative Services, Dept. of · Box 7DCAS · folder “Proposal for Full Comprehensive MEP Engineering Services for Forest Ci…” · matched page 10Administrative record associated with the 90-92 West Broadway property at the World Trade Center site.
10 pages · 2000-03-16 – 2002-03-15 · Environmental Protection, Dept. of · Box DEP Box 39 · folder “90-92 West Broadway” · matched page 5Report titled Community HealthWorks assessing community health in Lower Manhattan following the World Trade Center attacks.
12 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 11 · folder “NYC DOH” · matched page 1Memo submitting a proposed air sampling plan to commence on September 14, 2001, near the WTC hot zone.
8 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 26 · matched page 2Department of Environmental Protection letter dated October 25, 1982, providing comments on revised plans for relocating river water intake lines at the World Trade Center.
4 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STA…” · matched page 3Consulting engineer transmits blueprints and prints for the Park Avenue emergency tunnel exit project.
3 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Park Avenue Emergency Tunnel Exits - MANHATTAN” · matched page 3Letter requesting missing drawing D-1, as-built sewer drawings, and load summaries for the Park Avenue project.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Park Avenue Emergency Tunnel Exits - MANHATTAN” · matched page 2Sign-in sheet · 1
Fragmented contact information from a Department of Environmental Protection file regarding World Trade Center environmental records.
14 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 08 · folder “E-MAIL ADDRESSES” · matched page 5Unclassified · 19
Fragmented document page from the DEP archive folder concerning World Trade Center No. 7 infrastructure.
2 pages · 1990-05-25 · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Street Improvement No. 7 World Trade Center” · matched page 1Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.
83 pages · 2000-08-29 · Records and Information Services, Dept. of · Box — · folder “Folder_0049” · matched page 16Department of Transportation notification informing contractors of a work embargo in Lower Manhattan from November to January.
2 pages · 2002-11-08 – 2003-01-02 · Environmental Protection, Dept. of · Box DEP Box 39 · folder “NO LICENSE AGREEMENTS” · matched page 1Letter notifying a contractor of the Lower Manhattan work embargo effective November 18, 2002.
2 pages · 2002-11-14 – 2003-01-02 · Environmental Protection, Dept. of · Box DEP Box 39 · folder “NO LICENSE AGREEMENTS” · matched page 1Automated transmission confirmation from DEP regarding WTC site activities dated December 2, 2002.
3 pages · 2002-12-02 – 2003-03-31 · Environmental Protection, Dept. of · Box DEP Box 39 · folder “NO LICENSE AGREEMENTS” · matched page 3Letter from NYC DOT advising building owners on maintenance and re-occupancy steps following the World Trade Center collapse.
1 page · no date extracted · Environmental Protection, Dept. of · Box DEP Box 02 · folder “4 SOUTH STREET Block: 2 Lot: 1” · matched page 1Administrative header identifying the site location and BIN number for environmental records concerning 10 South Street.
1 page · no date extracted · Environmental Protection, Dept. of · Box DEP Box 02 · folder “4 SOUTH STREET Block: 2 Lot: 1” · matched page 1Transmittal letter from the Department of Transportation to DEP regarding an inspection at 10 South Street.
1 page · no date extracted · Environmental Protection, Dept. of · Box DEP Box 02 · folder “10 SOUTH STREET Block: 2 Lot: 1” · matched page 1Letterhead from the NYC Department of Transportation regarding World Trade Center site activities.
1 page · no date extracted · Environmental Protection, Dept. of · Box DEP Box 39 · folder “NO LICENSE AGREEMENTS” · matched page 1Department of Transportation correspondence confirming coordination efforts for capital reconstruction and environmental cleanup.
4 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 31 · folder “125 CEDAR 1 OF 2” · matched page 4Cover sheet from the Department of Transportation Bureau of Transportation Planning and Research listing agencies involved in the World Trade Center utility relocation.
10 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “WORLD TRADE CENTER - RELOCATION OF RIVER WATER INTAKE LINES & PUMP STA…” · matched page 1Department of Environmental Protection letter dated February 9, 1982, stating no further comments are required as the Lincoln Tunnel bridge rehabilitation involves no sewer work.
3 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “LINCOLN TUNNEL CONTRACT NO. LT. 245, W.37, 38 39TH ST. BRIDGES OVER DY…” · matched page 2A cover sheet or index page for documents related to the repair of bridges on the New York Expressway and Dyer Avenue.
3 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “LT - 268 LINCOLN TUNNEL N.Y. APPROACH REPAIR TO BRIDGE ON THE NY EXPWY…” · matched page 1Letter from engineering firm discussing mutual resolution of items including easements with the Department of Environmental Protection.
1 page · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “North Access Tunnel W. 33rd St. To w. 38TH ST” · matched page 1Transmittal letter regarding tree removal along a sidewalk to accommodate sub-surface utilities.
3 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Cont. M - 54-186 Mitchel Square” · matched page 2Administrative record listing organizational affiliations or advisory board members from March 1982.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “U.S.S. Intrepid Museum - Pier 86 W. 46 St. DRAWINGS” · matched page 1Letter from Port Authority to DEP proposing a new sewer alignment north of the kiosk foundation for the Dey Street underpass.
1 page · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “P.A WTC C-81, DEY St. Replacement Sewer (WTC-DEY ST UNDERPASS)” · matched page 1Fragmented and illegible text from a DEP archive folder concerning World Trade Center No. 7 infrastructure.
2 pages · no date extracted · Environmental Protection, Dept. of · Box DEP Box 44 · folder “Street Improvement No. 7 World Trade Center” · matched page 2Related buildings on the same block
Block-lot keys and present-day footprint joins; not a reconstruction of 2001 buildings.
No same-block matches established by this place’s block-lot key or present-day footprint join.