NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/P.A WTC C-81, DEY St. Replacement Sewer (WTC-DEY ST UNDERPASS)
Document / 1 page

DEP memo on WTC Dey St sewer alignment, Oct 2

Machine-extracted title · confidence 95%

Letter from Port Authority to DEP proposing a new sewer alignment north of the kiosk foundation for the Dey Street underpass.

NYC-WTC_000165613

Folder label: “P.A WTC C-81, DEY St. Replacement Sewer (WTC-DEY ST UNDERPASS)

Page image
Scanned page image, NYC-WTC_000165613
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

THE PORTAlflhoRrTY Engsnsft R W. hie* Enginee .7

October 2, 1979

Mr. Frederick Novotny, P.E. Chief, Division of Sewer Design Bureau of Sewers New York City Department of Envirbnmental Protection 40 Worth Street New York, New York 10007 Subject: World Trade Center Dey Street Underpass

Dekr Mr. Novotny: In connection with the planned Dey Street Underpass under Church Street, extensive utility relocation will be required. Based upon utility information we have available and as a result of preliminary discussions with certain of the utilities, it was determined that the best alignment to re-route the City's sewer in Dey Street is to the north of the kiosk founda­ tion structure. It is proposed to replace the existing 3’6" by 2'4" sewer which presently terminates with a 15" sewer section at Church Street with an 18" sewer and a 15" sewer, as shown on the enclosed "Working Drawing" dated September 11, 1979. Prior to progressing our plans further, we would appreciate your review of this "Working Drawing". As you can see from this drawing, it is also proposed to re-route the existing steam line along the north side of the kiosk foundation, thus incurring an additional limitation on available space. We have determined (confutations enclosed) that the capacity of the re-routed section of 18" sewer will have a greater capacity than the existing 15" sewer. Por your reference we are also enclosing a drawing showing existing utilities and a set of functional drawings. We would appreciate any comments you might have at this stage of the development of the plans for the Dey Stteet Underpass. Mr. John Spencer of iny staff is available to discuss the proposed work. Mr. Spencer may be reached on 466-7144. Thank you for your cooperation. Very^truly yours, 01234

R. M. Monti Chief Engineer Encs.

NYC-WTC_000165613

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165613Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →