NYC 9/11 Public Portal Document
231.020
May 13, 1980
Mr. R. M. Monti, P.E. RE: WTC-776.00; Dey Street
Chief Engineer Underpass & Utility
Port Authority of N.Y. & N.J. Relocation
One World Trade Center
New York, New York 10048 Borough of Manhattan
Gentlemen:
In reply to your revised submittal of Drawing No. 3 of the plans
for the referenced project, with your letter dated April 2, 1980,
please be advised that no approval can be given for these plans
until the following comments are complied with:
1) Two (2) complete sets of the latest plans should be submitted
for our review showing all up-dated revisions, so that new
information shown on Drawing 3 can be examined in profile,
section or detail as shown on other sheets.
2) The plans should indicate the distinction between those existing
utilities to remain and these to be removed or abandoned, especially
where they are close to existing or proposed sewers.
3) The proposed 15” dia. ductile iron pipe between new sewer man
hole 3 and the existing M,H. in Church Street should be completely
encased in concrete, since it will be located beneath other
utilities. In addition, the clearances between this pipe and the
escalator structure, as well as all the utilities crossing it
should be shown in a revised profile drawing. This was not done
in the previous profile drawing.
4) Revised plans should include a profile along the existing 3’-6” X
2'-8” sewer in Church Street, showing clearances with the escalator
structure and with all other proposed and existing utility lines
.-to remain.
NYC-WTC_000165597
OCR can misread numbers and units. Confirm readings against the page image before using them.