2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗Tunnel design meeting minutes, July 2, 1987
Machine-extracted title · confidence 86%Consultant submits meeting minutes documenting design resolutions and areas of agreement from July 2, 1987 coordination meeting.
NYC-WTC_000165371–000165373Folder label: “North Access Tunnel W. 33rd St. To w. 38TH ST”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
<9 Pat / One Penn Plaza Brlnckarhoft New York, NY 10119 1OO rCARS QuaOaB 212-613-5000 Douglaa, Ine.
Engineers July 7, 1987 Planners Cable: Parklap, New York Telex: RCA 232 117 PKLP UR
Mr. Douglas Smith, P. E. Acting Chief Engineering Review Section Bureau of Services 40 Worth Street New York, NY 10013 Re: AMTRAK North Access Tunnel Structural ReyiewbyBOS
Dear Mr. Smith:
Enclosed please find a copy of the Minutes of the Meeting held in your office on July 2, 1987. Resolutions noted covers all the areas we have discussed. Please note that Item 3, has been revised to satisfy AMTRAK'S insistence of not to abandon the 15" 0 line. If you disagree with any resolution noted, plese inform us. Very truly yours.
PARSONS BRINCKERHOFF QUADE & DOUGLAS, INC.
Project Manager
Enc.
AG:jag:3D61 ■ 8 rag?
?' ^4 .i
ACanturyof Snginaaring Bxcallanco
NYC-WTC_000165371
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000165365
DEP Bureau of Sewers clarifies hydraulic review procedures and provides technical comments on proposed siphon design in tunnel.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165301
DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165322
Department of Environmental Protection letter providing design review comments on tunnel project contract drawings, requesting pressure relief manhole details, existing sewer…
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165399
Internal memorandum inquiring whether the Bureau accepts the proposed siphon concept shown in the 60% submission drawings for the Westside Connection Project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165403
Inter-office memorandum requesting hydraulic review of the proposed siphon in the Westside Connection Project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165331
Project responses to Bureau of Sewers technical comments regarding manhole details, existing facilities replacement, and drain specifications.
1 shared topics · Same agency, volume and box · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165337
Contractor responses to sewers bureau requirements on manhole maintenance, splash blocks replacement, and drain pipe specifications.
1 shared topics · Same agency, volume and box · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000165289
Environmental Protection Department record related to tunnel project between W. 33rd and W. 38th Street.
Filed in the same folder
NYC-WTC_000165290
Letter enclosing a signed agreement between DEP and a contractor regarding sewer work in the vicinity of 11th Avenue.
Filed in the same folder
NYC-WTC_000165299
DEP legal correspondence regarding tunnel construction and sewer work in vicinity of 11th Avenue and W. 33rd Street.
Filed in the same folder
NYC-WTC_000165301
DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
Filed in the same folder
Filed in the same folder