Same-box records
DEP siphon design hydraulic review letter, Jul 1987 · Box DEP Box 44NYC-WTC_000165365
DEP Bureau of Sewers clarifies hydraulic review procedures and provides technical comments on proposed siphon design in tunnel.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979
NYC-WTC_000165345 · Box DEP Box 445 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.964
DEP comments on 60% design drawings, April 1987 · Box DEP Box 44NYC-WTC_000165395
Department letter providing feedback on sewer relocation design drawings and elevation datum requirements.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957
DEP internal memo on siphon concept inquiry, Apr 1987 · Box DEP Box 44NYC-WTC_000165399
Internal memorandum inquiring whether the Bureau accepts the proposed siphon concept shown in the 60% submission drawings for the Westside Connection Project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957
DEP letter re tunnel project drawings, July 1987 · Box DEP Box 44NYC-WTC_000165377
Letter from DEP Bureau of Sewers regarding unreviseed drawings and as-built records for the tunnel project.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956
DEP memo re siphon concept inquiry, April 1987 · Box DEP Box 44NYC-WTC_000165401
Inter-office memorandum inquiring if the proposed siphon concept in the 60% submission drawings is acceptable to the Bureau of Sewers.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956
DEP memo re siphon hydraulics review, Apr 1987 · Box DEP Box 44NYC-WTC_000165403
Inter-office memorandum requesting hydraulic review of the proposed siphon in the Westside Connection Project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.955
DEP comments on drainage plans, Oct 1983 · Box DEP Box 44NYC-WTC_000165844
Department of Environmental Protection review comments on 30% plan drawings requesting key plans, legends, and distance measurements.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.953
DEP internal memo on 90% plan submission, Jun 1987 · Box DEP Box 44NYC-WTC_000165384
Internal memorandum acknowledging receipt of 90% submission drawings for the Westside Connection Project and referencing hydraulic computations.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951
Internal sewer capacity memo, 10th Ave Tunnel, Nov 1983 · Box DEP Box 44NYC-WTC_000165835
Inter-departmental memorandum confirming that a proposed 30-inch RCP sewer has adequate capacity for the tunnel project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951
Tunnel W. 33rd-38th Street plan approval, Feb 1988 · Box DEP Box 44NYC-WTC_000165301
DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
1 shared topics · Same agency, volume and box · similarity 0.951
NYC-WTC_000165700 · Box DEP Box 441 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.950