Internal DEP memo on sewer capacity review, Nov 1983 · Box DEP Box 44NYC-WTC_000165837
Inter-departmental memorandum requesting hydraulic analysis to verify proposed sewer capacity matches existing brick egg-shaped sewer.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.978
DEP approves tunnel hydraulics with minor corrections, Nov 1987 · Box DEP Box 44NYC-WTC_000165343
DEP Bureau of Sewers approves tunnel plans with no additional hydraulic objections and minor drafting corrections noted.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.967
DEP internal memo on 90% plan submission, Jun 1987 · Box DEP Box 44NYC-WTC_000165384
Internal memorandum acknowledging receipt of 90% submission drawings for the Westside Connection Project and referencing hydraulic computations.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956
DEP internal memo on siphon concept inquiry, Apr 1987 · Box DEP Box 44NYC-WTC_000165399
Internal memorandum inquiring whether the Bureau accepts the proposed siphon concept shown in the 60% submission drawings for the Westside Connection Project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.953
DEP comments on drainage plans, Oct 1983 · Box DEP Box 44NYC-WTC_000165844
Department of Environmental Protection review comments on 30% plan drawings requesting key plans, legends, and distance measurements.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.953
STV&K revised plans submission for 10th Ave Tunnel, Nov 1983 · Box DEP Box 44NYC-WTC_000165833
Letter from STV&K submitting revised engineering plans for the 10th Avenue tunnel project in accordance with DEP comments.
1 shared topics · Same agency, volume and box · similarity 0.952
DEP memo re siphon concept inquiry, April 1987 · Box DEP Box 44NYC-WTC_000165401
Inter-office memorandum inquiring if the proposed siphon concept in the 60% submission drawings is acceptable to the Bureau of Sewers.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
DEP memo re siphon hydraulics review, Apr 1987 · Box DEP Box 44NYC-WTC_000165403
Inter-office memorandum requesting hydraulic review of the proposed siphon in the Westside Connection Project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951
Internal memo: Westside Connection review request, Sep 1987 · Box DEP Box 44NYC-WTC_000165358
Inter-office memorandum requesting engineering review of final plans for the North Access Tunnel from W. 33rd to W. 38th Street.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951
DEP response to 95% plan submittal, Dec 1983 · Box DEP Box 44NYC-WTC_000165824
Department of Environmental Protection letter acknowledging receipt of 95% plans and referring comments previously sent to the consulting engineers.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.949
Revised plans transmittal, 10th Ave Tunnel, Nov 1983 · Box DEP Box 44NYC-WTC_000165840
Letter from engineers submitting revised plan sets in response to previous department comments on the tunnel project.
1 shared topics · Same agency, volume and box · similarity 0.948
DEP siphon design hydraulic review letter, Jul 1987 · Box DEP Box 44NYC-WTC_000165365
DEP Bureau of Sewers clarifies hydraulic review procedures and provides technical comments on proposed siphon design in tunnel.
1 shared topics · Same agency, volume and box · similarity 0.945