STV&K revised plans submission for 10th Ave Tunnel, Nov 1983

Machine-extracted title · confidence 95%

Letter from STV&K submitting revised engineering plans for the 10th Avenue tunnel project in accordance with DEP comments.

NYC-WTC_000165833–000165834

Folder label: “North Access Connection, AMTRAK 10th Ave. Tunnel

Page image
Scanned page image, NYC-WTC_000165833
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

■ < SHT SEELYE STEVENSON VA^T & KNECHT. ENGINEERS & PLANNERS. V 867 4000. Telex 64 9081 SSViSfK'

Nobember 10, 1983

City of New York 7 D&partment of Environmental Protecti-on Division of Sewer Regulation & Control Bureau of Sewers 4-^ 2358 Municipal Building New York, NY 10007 Attention: Mr. Frederick Novotny, P.E. < Chief Division of Sewer Regulation and Control Reference: Amtrak North Access Connection Tenth Avenue Tunnel Borough of Manhattan Subject: Sewer Work in 10th Avenue (95% Submission) SSV&K No.: 22-6018

Enclosed please find (3) sets of plans revised in accordance with your comnents as set forth in your letter of October 13, 1983 to Mr. Harry Kamamis, P.E., Director, Mass Transit Coordination, N.Y.C.D.O.T. In answer to Comment No. 12, the proposed 30" R.C.P. which replaces the existing 4'-0" X 2'-8" egg shaped brick sewer, carries the same flow as the 30" R.C.P. upstream which was installed under M.T.A. Contract No. 1-02-21064-0-0. An existing 6" C.I.P. force main and an existing 24" C.I.P. force main which tie into the existing 4'-0" x 2'-8" egg shaped brick sewer are being relocated (see Dwgs. C-UTl and CUT2.). The relocated force mains and the manhole (Manhole #2) to which they connect will be owned and maintained by Amtrak. No other house connections to the existing 4'-0" x 2'-8" egg shaped brick sewer to be replaced are known to exist. I have enclosed computations prepared during the design of M.T.A. Contract No. 1-02-21064-0-0 which indicate that the flow in the sewer rerouted under that contract is 12.96 C.F.S.. As no additional flow is added to our proposed 30" R.C.P. it will definitely be adequate to carry this flow (I have also enclosed computations of the capacity of the proposed 30" R.C.P.). As the existing 6" C.M.P. and 24" C.M.P. force mains are merely rerouted and then reconnected to the City System, there will be no additional flow to any portion of the City

STV ENGINEERS. Engineers, Architects. Planners, Construction Managers. Professional Member Firms: Si V / Bai’smcre Pransportation AsJ5oc!ares; STV'Lyon Associates: STV/Management Consui'ants Group: STV/ ii D. Noitingnarn & Associates' STV/Sanders Of Thomas; STV/Santafnc; STV 'Seelye Stevenson Va’ue & Knecht.

NYC-WTC_000165833

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165833Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →