NYC 9/11 Public Portal Document
DiMartino
Novotny jMj ^'^PATCHED
Smith
Aggarwal
Vogel
Oliveri
I
Khan/Henneberger
Suspense June 11, 1984
RA; Ip
Seelye Stevenson Value &. Knecht, Inc.
Engineers and Planners
99 Park Avenue
New York, NY 10016
RE: North Access Connection 10th".
Avenue Tunnel Amtrak, Borough
of Manhattan
Dear Sir:,
In reply to your suDinission of structural computations for fhe sewer chamber J
with a letter dated May 29, 1984, please he advised of the following comments
of this department:
1. The thickness of the roof slab for the proposed chamber, shall be
!
12” minimum. The value of fs used to compute, steel for roof slab,
invert sl>ab-and walls shall be 20 k.s.i. and not 24 -k.s.i.
2. The_precast reinforced concrete slab can not be lifted by sewer _ . I
maintenance people due to its present proposed size. The design
. of the slab shall be changed to provide a standard'-removable J.- 3
slab with the dhnfiguration of the sewer chamber changed as marked
in red on the plans.
I
fi'
3. The invert slab should be checked for shear and bond- •I
4. The invert slab has been again designed as a two way slab although
our connnent No. 3 (i) of our letter February’ 21, 1984 specifically
pointed that all slabs shall be designed one way.
I
Please revise your structural computations in accordance with the above t
comments and submit three (3) sets of corrected computations and contract Ji
drawings for our review and approval.
Copy to:.4 Very truly yours.
Mr. Harry Kamamis, P.E.,
Director • i
Mass Transit Coordination
NYC Dept, of Transportation
51 Chambers St., Rm. #423
New York, NY 10007
PREDERICK NOVOTNY. P.E., CHIEF
Div. of Sewer Regulation & s
Control, Bureau of Sewers
■I