NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/North Access Connection, AMTRAK 10th Ave. Tunnel
Document / 4 pages

DEP sewer chamber structural design comments, June 1984

Machine-extracted title · confidence 85%

Department of Environmental Protection memo reviewing structural computations for a proposed sewer chamber, providing specifications for roof slab thickness and steel values.

NYC-WTC_000165786–000165789

Folder label: “North Access Connection, AMTRAK 10th Ave. Tunnel

Page image
Scanned page image, NYC-WTC_000165786
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

cc: DiMartino Novotny 1 Smith Aggarwal L Vogel Oliveri Khan/Henneberger Suspense lune 11, 198A RA: Ip

Seelye Stevenson Value &. Knecht, Inc. ..Wf, Engineers and Planners 99 Park Avenue New York, NY 10016

RE: North Access Connection 10th”.- Avenue Tunnel Amtrak, Borough of Manhattan '' „ .

Dear Sir:

In reply to your submission of structural computations for the sewer chamber 1 with a letter dated May 29, 198A,.pl ease be advised of the following comments of this department:

1. The thickness of the roof slab for the proposed chamber, shall be 12" minimum. The value of fs used to compute, steel for roof slah, invert slab-and walls shall be 20 k.s.i. and not 24 k.s.i. I 2. The^ precast reinforced concrete slab can not be lifted by sewer _ maintenance people due to its present proposed size. The design' . of the slab shall be changed to provide a standard''removable ' slab with tiie cPirfiguration of the sewer chamber changed as marked in red on the plans. i

3. The invert slab should be checked for shear and bond- il ! 4, The invert slab has been again designed as a two way slab although our comment No. 3 (i) of our letter February 21, 1984 specifically pointed that all slabs shall be designed one way.

Please revise your structural computations in accordance with the above comments and submit three (3) sets of corrected computations and contract drawings for our review and approval.

Copy to: Very truly yours. Mr. Harry Kamamis, P.E., Director Mass Transit Coordination I I, NYC Dept, of Transportation 51 Chambers St., Rm. #423 FREDERICK NOVOTNY. P.E., CHIEF Div, of Sewer Regulation & i u0 New York, NY 10007 Control, Bureau of hewers

r 1 ij • ■

1

NYC-WTC_000165786

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165786Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →