Dear Sir:
In reply to your submission of structural computations for the sewer chamber 1
with a letter dated May 29, 198A,.pl ease be advised of the following comments
of this department:
1. The thickness of the roof slab for the proposed chamber, shall be
12" minimum. The value of fs used to compute, steel for roof slah,
invert slab-and walls shall be 20 k.s.i. and not 24 k.s.i.
I
2. The^ precast reinforced concrete slab can not be lifted by sewer _
maintenance people due to its present proposed size. The design'
. of the slab shall be changed to provide a standard''removable '
slab with tiie cPirfiguration of the sewer chamber changed as marked
in red on the plans. i
3. The invert slab should be checked for shear and bond-
il
!
4, The invert slab has been again designed as a two way slab although
our comment No. 3 (i) of our letter February 21, 1984 specifically
pointed that all slabs shall be designed one way.
Please revise your structural computations in accordance with the above
comments and submit three (3) sets of corrected computations and contract
drawings for our review and approval.
Copy to: Very truly yours.
Mr. Harry Kamamis, P.E.,
Director
Mass Transit Coordination I I,
NYC Dept, of Transportation
51 Chambers St., Rm. #423
FREDERICK NOVOTNY. P.E., CHIEF
Div, of Sewer Regulation & i
u0
New York, NY 10007 Control, Bureau of hewers
r 1
ij • ■
1
NYC-WTC_000165786
OCR can misread numbers and units. Confirm readings against the page image before using them.