3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗DEP letter re tunnel project drawings, July 1987
Machine-extracted title · confidence 95%Letter from DEP Bureau of Sewers regarding unreviseed drawings and as-built records for the tunnel project.
NYC-WTC_000165377–000165383Folder label: “North Access Tunnel W. 33rd St. To w. 38TH ST”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
AMTRAK H^ional Railroad Passenger CorporatiM^ 2000 Market Street, 6th Floor Philadelphia. PA 19103
June 4, 1987
^4r. Magdi Farag Chief Division of Sewer Regulation and Control Bureau of Sewers 40 Worth Street, 9th Floor New York, NY 10013
Subject: Westside Connection Project New York, New York North Access Tunnel Project - 90% Submission
Dear Mr. Farag;
Enclosed for yotir review and comments are tliree sets of the 90% Submission of the Contract Documents for the subject project.
Please review and return your comments to Amtrak with copy to Parsons Brinckerhoff no later than Tuesday, June 23, 1987, using the attached Design Review Comment Sheet for this project. If there are no comments, please return Comment Sheet marked "No Comment".
The Design Review Meeting will be held at Parsons Brinckerhoff’s offfice on June 30, 1987 at 10:00 AM to review all comments and progress of the project.
Parsons Brinckerhoff One Penn Plaza Fifth Floor New York, New York 10119 Telephone: 212-613-5202 Attention: Mr. Ahmet Gursoy, Project Manager
Thank you for your cooperation.
Sincerely,
A.E. Shaw Jr. PE * Director of Engineering Track Structures
AES/AG/ani/029
NYC-WTC_000165381
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000165395
Department letter providing feedback on sewer relocation design drawings and elevation datum requirements.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165844
Department of Environmental Protection review comments on 30% plan drawings requesting key plans, legends, and distance measurements.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165322
Department of Environmental Protection letter providing design review comments on tunnel project contract drawings, requesting pressure relief manhole details, existing sewer…
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165358
Inter-office memorandum requesting engineering review of final plans for the North Access Tunnel from W. 33rd to W. 38th Street.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165556
Mailroom dispatch document regarding the World Trade Center Church Street Underpass project.
1 shared topics · Same agency, volume and box · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165831
Department of Environmental Protection review comments on submitted sewer plans requiring stationing, invert elevations, and manhole labeling.
1 shared topics · Same agency, volume and box · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165790
Letter provides specific design comments regarding roof slab thickness and removable slab configuration requirements.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165786
Department of Environmental Protection memo reviewing structural computations for a proposed sewer chamber, providing specifications for roof slab thickness and steel values.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000165384
Internal memorandum acknowledging receipt of 90% submission drawings for the Westside Connection Project and referencing hydraulic computations.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165395
Department letter providing feedback on sewer relocation design drawings and elevation datum requirements.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165405
Inter-office memorandum requesting review of hydraulic computations for the siphon and gravity sewer routing in the 60% submission.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165401
Inter-office memorandum inquiring if the proposed siphon concept in the 60% submission drawings is acceptable to the Bureau of Sewers.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000165289
Environmental Protection Department record related to tunnel project between W. 33rd and W. 38th Street.
Filed in the same folder
NYC-WTC_000165290
Letter enclosing a signed agreement between DEP and a contractor regarding sewer work in the vicinity of 11th Avenue.
Filed in the same folder
NYC-WTC_000165299
DEP legal correspondence regarding tunnel construction and sewer work in vicinity of 11th Avenue and W. 33rd Street.
Filed in the same folder
NYC-WTC_000165301
DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
Filed in the same folder
Filed in the same folder