November 23, 1983
Seelye Stevenson Value & Knecht, Inc.
Engineers & Planners
99 Park Avenue
New York, NY 10016
RE: North Access Connection, 10th Avenue
Tunnel Amtrak, Borough of Manhattan
Dear Sir:
In reply to, your submittal of 95Z plans with a letter dated November 10, 1983
on the above referenced project, please be advised of the following specific
commetns of this department:
A) Drawing No. C-Ul;
1. Show stationing and invert elevations at all existing manholes.
2. Show the existing sewer exactly as per MTA Contract No. 1-02-21064-0-0 ie,
locations where it is plugged, abandoned etc.
3. Label the drain and expansion joint manhole.
B) Drawing No. C-D2:
1. Manhole No. 2 should be pressure relief manhole and not type A-1 manhole.
Submit details.
2. Manhole No. 1 should be a chamber and not type A-2 manhole. Submit details
and structural computations.
C) Drawing No. C-UTl:
1. Show stationing of manhole No. 1 and existing manhole.
-2. Manhole No. 1 will be a chamber and M.H. 2 will be a pressure relief manhole.
3. Show angle of deflection between the proposed 24" and 30" R.C.P. class III
pipes at proposed manhole No. 1.
-cont-