NYC 9/11 Public Portal Document
-4-
vi) New catch basin connections should be 12" diameter ductile iron pipe, class • internally locked "Push~On" joints laid on 6" of broken stone for rhe r of the trench and for one-half the pipe diameter. The broken stone shall h unweathered stone uniformly graded from i" to 3/4" in diameter. It shah to commercial i" to 3/4" stone.
vii)Flush and clean all existing basin connections to be utilized to receive flc..- all catch basins. Where the existing basin connections are found to be do’^s or in deteriorating condition they should be replaced with new 12" dieme vr iron pipe in accordance with the latest Department of Environmental F\ Standards. viii) All catch basins should have a hood on the outletting pipe.
ix) All new proposed catch basins should be connected to an existing sewer at manhole. Catch basins shall not under any circumstance be connected . sewer.
x) All scuppers should be repaired, damaged, and cleaned and flushed as to make them operable. Damaged castings should be replaced. At locations wz existing scuppers do not have 12" pipe or have deteriorated pipe, the .r. be replaced with new 12" diameter class 56 D.I. Pipe.
The hydraulic computations as submitted by you are being reviewed by oar Drainage Review Section. Dieir comments will be related to you when recc:" that office. No approval can be accorded before the hydraulics of the pre approved.
Please submit three (3) complete sets of contract drawings revised in cccor these comments and those marked in red on the plans for our review.
Very truly yours,
MAGDI FARAG, CHIEF Division of Sewer Regulations & Control, Bureau of Sewers
(
NYC-WTC_000165380
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165322
Department of Environmental Protection letter providing design review comments on tunnel project contract drawings, requesting pressure relief manhole details, existing sewer…
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165790
Letter provides specific design comments regarding roof slab thickness and removable slab configuration requirements.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000165289
Environmental Protection Department record related to tunnel project between W. 33rd and W. 38th Street.
Filed in the same folder
NYC-WTC_000165290
Letter enclosing a signed agreement between DEP and a contractor regarding sewer work in the vicinity of 11th Avenue.
Filed in the same folder
NYC-WTC_000165299
DEP legal correspondence regarding tunnel construction and sewer work in vicinity of 11th Avenue and W. 33rd Street.
Filed in the same folder
NYC-WTC_000165301
DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
Filed in the same folder
Filed in the same folder