Machine-extracted title · confidence 95%Letter from DEP Bureau of Sewers regarding unreviseed drawings and as-built records for the tunnel project.
NYC-WTC_000165377–000165383Folder label: “North Access Tunnel W. 33rd St. To w. 38TH ST”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
-3-
16. Show the existing columns and footings along the route of the proposed sewer inverted siphon. Show the details of reinforcement in all the chambers end -i'- ’ siphon. 17. The design of the inverted siphon does not meet D.E.P. criteria. An cr siphon for peak sanitary flow should be provided. This was conveyed t.^ phone previously and in a meeting held on June 23, 1987. 18. A meeting was held on July 2, 1987 tn which details of underpinrdng as .< ... drawing Nos.S-4S and S-46 were discussed. Comments were given at this m'-e and it was agreed that plans will be revised accoidingly. 19. The title sheet should have a N.Y.S.P.E. seal and signatures.
Add the following notes:
i) All proposed drainage work shall be done in conformance with the latest of the Department of Environmental Protection.
ii) All existing standard basins should be repaired, if damaged, and cleaned, ana as necessary, to make them operable. Damaged castings should be replaced. Ext non-standard basins at locations where basins are required shall be replace: new standard basins.
Ui) Abandoned drainage structures as shown on contract plans are to be ; (2) feet below subgrade and filled with compacted clean sand. All i,-,
to be abandoned and fall into this category. Basin connections not required sn. be bulkheaded at both ends.
iv) All existing sewer manholes within the contract limits should be adjusted as ne : - so that they will be flush, with the finished grades after completion of Any of these manholes which have damaged, worn or non-standard frames ij-i -I
should be provided with new 27" castings in accordance with the latest star’de: of N.Y.C.D.E.P. including any necessary modifications of the manhole maser. Any damage to the manhole caused by this work shall be repaired, or repln:, the contractor, as directed by the engineer, and at no cost to the City. v) Where the height of an existing manhole permits more than one (1) basin co-.'-.. to be made on the same wall, special precaution shall be taken to protec i thi. ural integrity of the manhole. The minimum clearance between the outside ■. of any two basin connections or between a basin connection and a sewer, verti: or horizontally, shall be 12 inches.
NYC-WTC_0001 65379
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165322
Department of Environmental Protection letter providing design review comments on tunnel project contract drawings, requesting pressure relief manhole details, existing sewer…
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165790
Letter provides specific design comments regarding roof slab thickness and removable slab configuration requirements.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000165289
Environmental Protection Department record related to tunnel project between W. 33rd and W. 38th Street.
Filed in the same folder
NYC-WTC_000165290
Letter enclosing a signed agreement between DEP and a contractor regarding sewer work in the vicinity of 11th Avenue.
Filed in the same folder
NYC-WTC_000165299
DEP legal correspondence regarding tunnel construction and sewer work in vicinity of 11th Avenue and W. 33rd Street.
Filed in the same folder
NYC-WTC_000165301
DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
Filed in the same folder
Filed in the same folder