DEP letter re tunnel project drawings, July 1987

Machine-extracted title · confidence 95%

Letter from DEP Bureau of Sewers regarding unreviseed drawings and as-built records for the tunnel project.

NYC-WTC_000165377–000165383

Folder label: “North Access Tunnel W. 33rd St. To w. 38TH ST

Page image
Scanned page image, NYC-WTC_000165379
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

-3-

16. Show the existing columns and footings along the route of the proposed sewer inverted siphon. Show the details of reinforcement in all the chambers end -i'- ’ siphon. 17. The design of the inverted siphon does not meet D.E.P. criteria. An cr siphon for peak sanitary flow should be provided. This was conveyed t.^ phone previously and in a meeting held on June 23, 1987. 18. A meeting was held on July 2, 1987 tn which details of underpinrdng as .< ... drawing Nos.S-4S and S-46 were discussed. Comments were given at this m'-e and it was agreed that plans will be revised accoidingly. 19. The title sheet should have a N.Y.S.P.E. seal and signatures.

Add the following notes:

i) All proposed drainage work shall be done in conformance with the latest of the Department of Environmental Protection.

ii) All existing standard basins should be repaired, if damaged, and cleaned, ana as necessary, to make them operable. Damaged castings should be replaced. Ext non-standard basins at locations where basins are required shall be replace: new standard basins.

Ui) Abandoned drainage structures as shown on contract plans are to be ; (2) feet below subgrade and filled with compacted clean sand. All i,-,

to be abandoned and fall into this category. Basin connections not required sn. be bulkheaded at both ends.

iv) All existing sewer manholes within the contract limits should be adjusted as ne : - so that they will be flush, with the finished grades after completion of Any of these manholes which have damaged, worn or non-standard frames ij-i -I

should be provided with new 27" castings in accordance with the latest star’de: of N.Y.C.D.E.P. including any necessary modifications of the manhole maser. Any damage to the manhole caused by this work shall be repaired, or repln:, the contractor, as directed by the engineer, and at no cost to the City. v) Where the height of an existing manhole permits more than one (1) basin co-.'-.. to be made on the same wall, special precaution shall be taken to protec i thi. ural integrity of the manhole. The minimum clearance between the outside ■. of any two basin connections or between a basin connection and a sewer, verti: or horizontally, shall be 12 inches.

NYC-WTC_0001 65379

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165379Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →