Internal memo: Westside Connection review request, Sep 1987 · Box DEP Box 44NYC-WTC_000165358
Inter-office memorandum requesting engineering review of final plans for the North Access Tunnel from W. 33rd to W. 38th Street.
1 shared topics · Same agency, volume and box · similarity 0.935
DEP siphon design hydraulic review letter, Jul 1987 · Box DEP Box 44NYC-WTC_000165365
DEP Bureau of Sewers clarifies hydraulic review procedures and provides technical comments on proposed siphon design in tunnel.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.930
NYC-WTC_000165345 · Box DEP Box 441 shared topics · Same agency, volume and box · similarity 0.916
Tunnel project responses to sewers bureau review, Dec 1987 · Box DEP Box 44NYC-WTC_000165331
Project responses to Bureau of Sewers technical comments regarding manhole details, existing facilities replacement, and drain specifications.
1 shared topics · Same agency, volume and box · similarity 0.912
Tunnel responses to Bureau of Sewers comments, Dec 1987 · Box DEP Box 44NYC-WTC_000165337
Contractor responses to sewers bureau requirements on manhole maintenance, splash blocks replacement, and drain pipe specifications.
1 shared topics · Same agency, volume and box · similarity 0.912
DEP comments on drainage plans, Oct 1983 · Box DEP Box 44NYC-WTC_000165844
Department of Environmental Protection review comments on 30% plan drawings requesting key plans, legends, and distance measurements.
1 shared topics · Same agency, volume and box · similarity 0.907
NYC-WTC_000165374 · Box DEP Box 441 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.907
DEP letter re tunnel project drawings, July 1987 · Box DEP Box 44NYC-WTC_000165377
Letter from DEP Bureau of Sewers regarding unreviseed drawings and as-built records for the tunnel project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.905
Tunnel design meeting minutes, July 2, 1987 · Box DEP Box 44NYC-WTC_000165371
Consultant submits meeting minutes documenting design resolutions and areas of agreement from July 2, 1987 coordination meeting.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.905
DEP memo on 3rd Avenue sewer relocation requirements, Oct 1981 · Box DEP Box 44NYC-WTC_000165457
Memo outlining requirements for hydraulic analysis and profile views for a proposed sewer relocation project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.904
Internal DEP memo on sewer capacity review, Nov 1983 · Box DEP Box 44NYC-WTC_000165837
Inter-departmental memorandum requesting hydraulic analysis to verify proposed sewer capacity matches existing brick egg-shaped sewer.
1 shared topics · Same agency, volume and box · similarity 0.904
Consultant response to DEP on 60% submission, April 1987 · Box DEP Box 44NYC-WTC_000165389
Correspondence addressing departmental comments on the 60 percent design submission for the tunnel project.