NYC 9/11 Public Portal Document
JB&B
Jaros Baum &. Bolles Robert V. Benazzi
Consulting Engineers Partner
Tunnel Coordination
Rockefeller Research Laboratories
Memorial Sloan-Kettering Cancer Center-
New York, New York
Job No. 622800
September 4, 1987
Mr. Douglas Smith
Bureau of Sewers
Room 904C
40 Worth Street
New York, New York 10013
Dear Mr. Smith:
We are enclosing a copy of Drawing PT-1 and S-2 showing the location of a
proposed new tunnel under 67th Street connecting the new Rockefeller Research
Laboratory building to the existing Hospital. The tunnel, as currently
designed, would pass over the existing 15 inch combined sewer In 67th Street.
The Department of Transportation has requested that the tunnel be lowered two
feet, which would then Interfere with the sewer. As we discussed today, it
has been suggested that an inverted siphon be used to divert the sewer under
the lowered tunnel. We understand from our conversation that the use of the
inverted siphon is not permitted by your Department. We would appreciate
your prompt written confirmation of our understanding.
Thank you for your aid in this matter.
Very truly yours.
JAROS, BAUM & BOLLES
RVB:jf
cc: (1) Mr. J. Roberts
(1) Mr. S. Brody
(1) Mr. T. Schultz
(1) Mr. P. C. Wong
(1) Mr. H. 0. Aaronson
(1) Mr. A. A. DiGiacomo
(1) Mr. R. V. Benazzi
U) Mr. M. W. Simpler
(1) Mri J. M. Bracclodieta
(1) Mr. E. Colesanti
(1) Mr. P. T. Schwer
(1) File
Enc.
345 Park Avenue NewYork NY 10154 212-758-9000 Tfelex 125081 Pax 212-980-1887
NYC-WTC_000165444