With this in mind a scheme was developed which included the following:
1) A new special "L" shaped manhole would be constructed on the
sewer at the north building line in place of proposed Manhole
No. 3 Special attention would be given to the existing tele
phone ducts which may require partial relocation.
2) A new manhole would be constructed on the sewer at the transition
to the special 3’-6" X 2’-4" Cast Iron Section located approximately
3.5 feet south of the south curbline.
3) The two catch basin cleanout manholes wou|4^ be abandoned or removed
as required. Two new catch basins should replace the corner Granite
Head inlets. These basins would be connected directly to ithe.;new
manholes described in 1 and 2.
A) Between the two manholes described in 1 and 2 the sewer will be re
placed with a 36" Ductile Iron Pipe.
There are also several other modifications marked in red on the enclosed set of
plans.
We are also furnishing a copy of our standard specifications for your information.
As discussed it may be advantageous to establish another working meeting prior to
submission of revised contract drawings. Please feel free to contact Mr. Magdi
Farag, P.E., at 566-5616 for assistance.
cc: DiMartino
Novotny Very truly yours.
Farag
Nagy
Suspense
MN: Ip
FREDERICK NOVOTNY, P.E., CHIEF
Division of Sewer Regulation
and Control, Bureau of Sewers