NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 44/North Access Connection, AMTRAK 10th Ave. Tunnel
Document / 5 pages

DEP response to 95% plan submittal, Dec 1983

Machine-extracted title · confidence 95%

Department of Environmental Protection letter acknowledging receipt of 95% plans and referring comments previously sent to the consulting engineers.

NYC-WTC_000165824–000165828

Folder label: “North Access Connection, AMTRAK 10th Ave. Tunnel”

Page image
Scanned page image, NYC-WTC_000165828
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

-2-

D) Drawing No. C-UTz;

■ 1. Manhole No. 1 should be chamber and manhole No. 2 should be pressure relief manhole.

2. Show the distances between the proposed manhole No. 1 and the existing man­ hole, and between the existing manhole and the outer wall of the tunnel. Al­ so show the length of the existing 4’-0" X 2’-8" sewer being replaced.

3. Show as to what is under the concrete cradle of the proposed 30" R.C.P. Sewer.

Submit details of support for the proposed 12" and 30" water mains and other existing electric conduits, telephone conduits and gas main etc. Show the vertical clearance between the the bottom of the proposed 36" water main and top of proposed 24" R.C.P. sewer at their crossing. Also one of the existing electric conduit is in very close proximity of the proposed man­ / hole No. 2.

5. Show details of R.C. Collar.

Please submit three (3) sets of corrected plans revised in accordance with the above comments and those marked in red on the enclosed set of plans for our re­ view and approval.

ENCLOSURE.

cc; DiMartino Novotny Very truly yours. Vogel Oliveri Farag Yee/Swedlow(RM. #929) Khan/Henneberger FREDERICK NOVOTNY, P.E., CHIEF Aggarwal Div. of Sewer Regulation & Suspense Control, Bureau of Sewers RA:lp

Copy to: Mr. Harry Kamamis, P.E., Director Mass Transit Coordination NYC Department of Transportation 51 Chambers Street, Rm. 423 New York, NY 10007

\

1

NYC-WTC_000165828

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165828Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

DEP comments on drainage plans, Oct 1983 · Box DEP Box 44

NYC-WTC_000165844

Department of Environmental Protection review comments on 30% plan drawings requesting key plans, legends, and distance measurements.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.974

machine-extracted · confidence unavailable · Check page ↗
DEP comments on sewer plans, Nov 1983 · Box DEP Box 44

NYC-WTC_000165831

Department of Environmental Protection review comments on submitted sewer plans requiring stationing, invert elevations, and manhole labeling.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.961

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →