2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗North Access Connection, AMTRAK 10th Ave. Tunnel
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000165824–000165828
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
-2-
D) Drawing No. C-UTz;
■ 1. Manhole No. 1 should be chamber and manhole No. 2 should be pressure relief manhole.
2. Show the distances between the proposed manhole No. 1 and the existing man hole, and between the existing manhole and the outer wall of the tunnel. Al so show the length of the existing 4’-0" X 2’-8" sewer being replaced.
3. Show as to what is under the concrete cradle of the proposed 30" R.C.P. Sewer.
Submit details of support for the proposed 12" and 30" water mains and other existing electric conduits, telephone conduits and gas main etc. Show the vertical clearance between the the bottom of the proposed 36" water main and top of proposed 24" R.C.P. sewer at their crossing. Also one of the existing electric conduit is in very close proximity of the proposed man / hole No. 2.
5. Show details of R.C. Collar.
Please submit three (3) sets of corrected plans revised in accordance with the above comments and those marked in red on the enclosed set of plans for our re view and approval.
ENCLOSURE.
cc; DiMartino Novotny Very truly yours. Vogel Oliveri Farag Yee/Swedlow(RM. #929) Khan/Henneberger FREDERICK NOVOTNY, P.E., CHIEF Aggarwal Div. of Sewer Regulation & Suspense Control, Bureau of Sewers RA:lp
Copy to: Mr. Harry Kamamis, P.E., Director Mass Transit Coordination NYC Department of Transportation 51 Chambers Street, Rm. 423 New York, NY 10007
\
1
NYC-WTC_000165828
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000165829
Cover letter from the Department of Transportation Bureau of Planning and Research transmittal documents to various city agencies.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165851
Cover letter from the Department of Transportation transmittal documents to the DEP Bureau of Sewers and other agencies.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165301
DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
1 shared topics · Same agency, volume and box · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165790
Letter provides specific design comments regarding roof slab thickness and removable slab configuration requirements.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165786
Department of Environmental Protection memo reviewing structural computations for a proposed sewer chamber, providing specifications for roof slab thickness and steel values.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165343
DEP Bureau of Sewers approves tunnel plans with no additional hydraulic objections and minor drafting corrections noted.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 51 Chambers Street · 3 pages · confidence 0.00 · verify page 1
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Filed in the same folder
Filed in the same folder
Filed in the same folder
Filed in the same folder
Filed in the same folder