CITY OF NEW YORK
DEPARTMENT OF ENVIRONMENTAL PROTECTION
BUREAU OF SEWERS
INTER - DEPARTMENT
MEMORANDUM October 31, 1983
TO; FRANK OLIVERI, P.E., CHIEF, DIVISION OF SEWER MAINTENANCE
FROM; MAGDI FARAG, P.E., CHIEF, ENGINEERING REVIEW SECTION
SUBJECT; W.T.C. 776-DEY STREET ESCALATOR-UNDERPASS AT CHURCH STREET,
BOROUGH OF MANHATTAN
This office is currently evaluating a strategy for replacement
of an existing 3’-6" X 2‘-4" sewer which conflicts with the pro
posed escalator underpass.
To properly consider alternatives it will be necessary to inspect
the interior of the sewer to acertain the following:
a) In the Dey Street Manhole (shown on the attached sketch);
Verify the two (2) 6" spurs. Are the spurs live, and if
so, what do they service?
b) Obtain an accurate sketch of the cross sectional dimensions
of the special fabricated Cast Iron Elliptical section.
During the recent "Downtown Manhattan" inspections this location
was not inspected because of excessive steam. It will probably
be necessary to arrange for a steam shutdown or positive vent
ilation during the inspection.
cc: DiMartino
Novotny MAGDI FARAG, P.E., CHIEF
Farag Engineering Review Section
Nagy
Suspense
MN: Ip
DISPATCHED
NOV i
WATER PCLH* COHTROV
NYC-WTC_000165579