REs Amtrak Borth Access Tunnel
(Westside Connection Project)
Dear Mr. Farag:
The following are responses to your letter dated 10/29/87. These responses
also include the results of the meeting held December 10, 1987 and attended
by MYCDEP, MYDOT, Amtrak, and PB personnel. See attached attendance list.
COMMENT
BO. RBSPONSE RKSOMnpH
1. Complied. See note on Dwg. #C-11.
2. Type of proposed catch basins are
now shown on the plans. See Dwg-.
#C“22.
3. Specification indicates all existing
facilities impacted by the project to be
replaced. Therefore, all existing splash
blocks (existing) impacted will be replaced.
This will be repeated in the plan.
4. A note stating "all internal manholes
....... shall be maintained by
AMTRAK" is added as Mote #14 on Dwg. S-32.
5. In a meeting on July 2, 1987 with BOS/
Structural Group, it was agreed with
Mr. D. Smith that 15 inch diam. pipe is
AMTRAK'S property and it is existing.
The drain pipe collects general water
not directly connected to bridge .above
and should not be changed. 16 >dch diam.
new pipe is on the western end of the tunnel
and cannot be connected to 3.5'x3.5' concrete D.£p.Suf^U OFSEWERSi
box.
6. Mot in direct conflict. It is close.
JAN 1 11988