Same-box records
DEP final design review comments, tunnel project, Jan 1988 · Box DEP Box 44NYC-WTC_000165322
Department of Environmental Protection letter providing design review comments on tunnel project contract drawings, requesting pressure relief manhole details, existing sewer…
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.991
NYC-WTC_000165345 · Box DEP Box 441 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.963
Tunnel project responses to sewers bureau review, Dec 1987 · Box DEP Box 44NYC-WTC_000165331
Project responses to Bureau of Sewers technical comments regarding manhole details, existing facilities replacement, and drain specifications.
1 shared topics · Same agency, volume and box · similarity 0.962
Tunnel responses to Bureau of Sewers comments, Dec 1987 · Box DEP Box 44NYC-WTC_000165337
Contractor responses to sewers bureau requirements on manhole maintenance, splash blocks replacement, and drain pipe specifications.
1 shared topics · Same agency, volume and box · similarity 0.959
DEP letter re tunnel project drawings, July 1987 · Box DEP Box 44NYC-WTC_000165377
Letter from DEP Bureau of Sewers regarding unreviseed drawings and as-built records for the tunnel project.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.958
DEP comments on drainage plans, Oct 1983 · Box DEP Box 44NYC-WTC_000165844
Department of Environmental Protection review comments on 30% plan drawings requesting key plans, legends, and distance measurements.
1 shared topics · Same agency, volume and box · similarity 0.957
DEP comments on sewer chamber structural computations, June 1984 · Box DEP Box 44NYC-WTC_000165790
Letter provides specific design comments regarding roof slab thickness and removable slab configuration requirements.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956
DEP sewer chamber structural design comments, June 1984 · Box DEP Box 44NYC-WTC_000165786
Department of Environmental Protection memo reviewing structural computations for a proposed sewer chamber, providing specifications for roof slab thickness and steel values.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956
Consultant response to DEP on 60% submission, April 1987 · Box DEP Box 44NYC-WTC_000165389
Correspondence addressing departmental comments on the 60 percent design submission for the tunnel project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.955
DEP comments on WTC Dey St manhole load, March 1982 · Box DEP Box 44NYC-WTC_000165536
March 15, 1982 DEP letter providing engineering requirements for a telephone manhole load above the proposed 13-inch sewer line.
1 shared topics · Same agency, volume and box · similarity 0.954
Tunnel W. 33rd-38th Street plan approval, Feb 1988 · Box DEP Box 44NYC-WTC_000165301
DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.953
NYC-WTC_000165700 · Box DEP Box 441 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951