machine-extracted · confidence unavailable · Check page ↗DEP final design review comments, tunnel project, Jan 1988
Machine-extracted title · confidence 90%Department of Environmental Protection letter providing design review comments on tunnel project contract drawings, requesting pressure relief manhole details, existing sewer…
NYC-WTC_000165322–000165328Folder label: “North Access Tunnel W. 33rd St. To w. 38TH ST”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
• IRifflirsiflc •IfiriitoteftMtSI 100 (!
b) Guide lines for design of chambers is attached to Hydraulic calculations. The selected radius satisfies all of the requirements. See calculations which are stamped by a P.E.
16. a) Dowels have been provided between the bottom slab and the walls of the 3'-6"x 3’-6" and 6'-0"x4'-0" concrete boxes.
b) All necessary Information and relevant details and bar placements are shown on Dwgs. S-93 and S-94.
c) A new manhole has been provided on the Flow Redirection Chamber.
17. a) Dwgs. S-33 thru S-36 have more details (sections a plans) than the sample given. There are 26 sections taken to cover 180 feet long siphon which should be adequate.
The selected sectional details are based on the following:.
. Plan . Elevation . Proper cross sections Suggested sections do not add anything more. Dwgs. were set up following the example given on Nov. 10, 1986. This saiiq>le has no such sections. In addition, there are 45 sectional plans shown on S-60 thru S-65. b) The Heir details are shown on Dwg. S-33.
18. The inverted siphon design and details has been revised to reflect:
1) 16" D.I.P. is not carried into the twin 6’-0"x4’-0" combination sewer. Revised clean-out arrangement to provide easy access for malntanence<^d the location of the weirs.
2) The weir in U/S of the maintenance chamber has been moved to Chamber A.
A Century of Bnalneertng excellence
NYC-WTC_000165326
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165377
Letter from DEP Bureau of Sewers regarding unreviseed drawings and as-built records for the tunnel project.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165331
Project responses to Bureau of Sewers technical comments regarding manhole details, existing facilities replacement, and drain specifications.
1 shared topics · Same agency, volume and box · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165790
Letter provides specific design comments regarding roof slab thickness and removable slab configuration requirements.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165786
Department of Environmental Protection memo reviewing structural computations for a proposed sewer chamber, providing specifications for roof slab thickness and steel values.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165337
Contractor responses to sewers bureau requirements on manhole maintenance, splash blocks replacement, and drain pipe specifications.
1 shared topics · Same agency, volume and box · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165536
March 15, 1982 DEP letter providing engineering requirements for a telephone manhole load above the proposed 13-inch sewer line.
1 shared topics · Same agency, volume and box · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000165289
Environmental Protection Department record related to tunnel project between W. 33rd and W. 38th Street.
Filed in the same folder
NYC-WTC_000165290
Letter enclosing a signed agreement between DEP and a contractor regarding sewer work in the vicinity of 11th Avenue.
Filed in the same folder
NYC-WTC_000165299
DEP legal correspondence regarding tunnel construction and sewer work in vicinity of 11th Avenue and W. 33rd Street.
Filed in the same folder
NYC-WTC_000165301
DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
Filed in the same folder
Filed in the same folder