NYC 9/11 Public Portal Document
100
ttMa
However, this is a temporary construction
condition. A note is added to Dwg. C-11.
7. Complied. See Section E on Dwg. S-35.
8. The Profile shown on S-32 will show the
following informationt
. Slope
. Type of sewer
. Hill make reference to Civil Dwg for grading
. Will refer to Dwg. S-33 for bedding
All Other items are shown on S-32.
We are showing all necessary information,
our scale is slightly different but
presentation is clear, constructable, and
well detailed drawings.
9. All expansion joints have been eliminated
and water stops from the construction
joints have been deleted.
10. Complied. They are shown on Dwg. S-36.
II. AMTRAK I.egal Dept, sent a letter to
Mr. Prank Schiano, Esq. on December*31,
1987. Both legal departments are working
on the required agreement.
12. Complied. See Dwg. C-11.
13. a) It is done. The I'-O collar is the
Integral part of the MH. See Sect. B
on Dwg. S-36.
b) Exact make up of the sewer not known.
If it is not the same as on 34th Street,
contractor will identify. A note will be
added to ask the contractor to identify
and describe It for as built Dwgs. See
Dwg. S-36.
c) Done. See Sec. E on Dwg. S-35.
14. Calculations have been reviewed^nd a v at
the bottom slab have been provided. See Section
A, B, and C on Dwg. S-33.
15. a) Done where necessary. See drawings S-35
and S-36.
bSSSSiXhSBxcetlenc9
NYC-WTC_000165325
OCR can misread numbers and units. Confirm readings against the page image before using them.