The selected sectional details are based
on the following:
Plan
Elevation
Proper cross sections
Suggested sections do not add anything
more. Dwgs were set up following the
example give on Nov. 10, 1986. This
sample has no such sections. In addition,
there are 45 sectional plans shown on S-60
thru S-65.
b) There are 3 sections showing the Weir , 11
details: ,
Dwg. S-33: Chamber A
Dwg. S-35: Sect. A & Sect. D
*18. (i) See Matrix.
(ii) See Matrix.
(iii) Will do.
(iv) (a) See Comment 17.
(b) Shown on Dwg S-34, Sections A & D.
19. The orientation of Sections A & B shown on
S-34 are coordinated with the Plan of Siphon
shown on Dwg S-32.
20. It is shown on Dwg s-35 plan Sections C S D.
21. Covers are shown on S-34. If necessary, a
reference note can be to Dwg. S-33.
22. This project requires the Engineer to bar
detail the structures. The bar detailing
followed ACI practice and the bar sizes and
spacing were Indicated on the plans. See
Legend shown on S-68.
NYC-WTC_000165334