LeRDY CALLENDER / PC. CONSULTING ENGINEERS
February 29, 1984
f Division of Environmental
Protection
40 Worth Street
New York, NY 10013,1
Attn: Mr. F. No
Re£__^ark_Avenue_Tunnel^_Emer£enc2_Exlrs
Improvement at 59th Street
Following a telephone conversation with you this afternoon I am
■»ending ’yQu--^laiiS Df pzcnQsed a'ew .CDlacraHis . located .abDye B 7. ft.
diameter sewer in the Park Avenue Tunnel at 59th Street. On
each drawing I have circled in red the area under considera
tion.
Please note the following facts:
1. The new columns carry lighter dead load (of road deck)
than existing columns to be removed.
2. New columns are all in the same line with respect to
the existing sewer as the existing columns.
3. Footings^which are typical,have been designed for a
maximum of 4 kips per square foot.
I shall appreciate your prompt reply regarding your approval or
comments on the proposed new columns.
Sincerely,
LeRoy Callender/P.C. Consulting Engineers
An^ew A. ^reku, P.E.
CiaOaJ.
■
Enclosure: 4 prints
.1 a 1
S eve ri-
□ 625 DELAWARE AVENUE/BUFFALO. N.Y. 14aOS/71S aS6-2S3<a
□ «4O1 EAST 37TH STBEET/NEW YORK. N.Y. 10016/212-604-^10/265-4 • HARTFORD. CONN.
NYC-\/VTC_000165428
OCR can misread numbers and units. Confirm readings against the page image before using them.