March 27, 1984
Leroy Callender, P.C.,
Consulting Engineers
401 Fast 37th Street
New York, NY 10016
TtE: Park Avenue Emergency Tunnel
Exits-Improvement at 59th
Street, Borough of Manhattan
Att: llr. Andrew Mireku, P.E.,
-rsJifiar jar- JdirektL:
-ite Jiave -raviewed yjDur proposal transmitted on February 29, 1984. Re
garding the new columns to be installed" on footings above the Y’—3"
diameter sewer; your drawing No. C-3 sheet 3 of 16 has a note direct-
ing attention to drawing D-1 for invert elevations of the existing
sewer. Drawing D-1 was not included with the transmittal.
Kindly transmit drawing D-1 along with the following:
1. Copy of the "As-Built" sewer drawing at this location (if you
have it) . .
2. Detail of the existing-column footings and their elevations.
3. Load summaries; for the existing and prop’osed columns. (Please
include both live and dead load tabulations) . The load sum-
•mariesi should bear the seal of a N.Y. registered Professional
Engineer.
We will continue review of your project upoh receipt of three (3)
sets of plans and the information as requested above.
cc: DiMartino
Novotny
"31^ Very truly yours.
Suspense
- MN:Ip
FREDERICK NOVOTNY, P.E., CHIEF
Div. of Sewer Regulation &
.. ^Control, Bureau of Sewers