March 27, 1984
Leroy Callender, P.C.,
Consulting Engineers
401 East 37th Street
New York, NY 10016
■RE: Park Avenue Emergency Tunnel
Exits-Improvement at 59th
Street, Borough of Manhattan
. Act: Mr. Andrew Mireku, P.E.,
•Jte sJaa*® .iZ^Kiewed yrmr proposal transmitted on February 29, 1984. Re
garding the new columns to be installetf on footings above the 7"' -3"
diameter sewer; your drawing No. C—3 sheet 3 of 16 has a note direct-
■ ing attention to drawing D-1 for invert elevations of the existing
sewer. Drawing D-1 was not included with the transmittal.
Kindly transmit drawing D-1 along with the following:
1. Copy of the "As-Built" sewer drawing at this location (if you
have it).
2. Detail of the existing" column footings and their elevations.
3. Load rsummariesr; for the exiating and prop’osed columns. (Please
include both live and dead load tabulations) . The load sum—
mariesi should bear the seal of a N.Y. registered Professional
Engineer.
We will continue review of your project upoA receipt of three (3)
sets of plans and the information as requested above.
cc; DiMartino
Novotny
___ Farag Very truly yours.
Nagy
Suspense
_ MN; Ip
FREDERICK NOVOTNY, P.E., CHIEF
; ..... Div. of Sewer Regulation &
Control, Bureau of Sewers