State of New York MEMBERS OF THE BOARD
Robert R. Kiley
CHAIRMAN
Lawrence R. Bailey
Daniel T Scannell
vice chairmcn
Carol Bellamy
Metro-North Stephen Berger
Commuter David W. Brown
Jane K. Butcher
Railroad Herbert J. Libert
John F. McAlevey
347 Madison Avenue Ronay Menschel
New York, N.Y. 10017
Phone 212-340-3000
;w> Constantine SIdamon-Erlstoll
Robert F. yyagner. Jr.
Robert T. Waldbauer
Allred E. Werner
Peter Stangl
August 28, 1984 PRESIDENT AND GENERAL MANAGER
NEW YORK CITY DEPARTMENT
OF ENVIRCNMENTAL PROTECTION
Bureau of Sewers
40 Worth Street
New York, NY 10013
Attention: Fr^er icj&-N^5P9:y<P .E.
Chie)^ Div. l^^^er Regulation & Control
RE: MO2A-02-08/IMPROVEMENTS TO EMERGENCY ITS OF PARK AVENUE
RAILROAD TUNNEL AT 59th & 86th STREETS
Transmittal of Final Drawings and Request for Concurrence in
Design of Improvements for 59th Street Emergency Exits
Dear Mr. Novotny:
In response to your April 18, 1984 correspondence to our design consultant,
LeRoy Callender/P.C., please find enclosed three (3) sets of final drawings on the
construction of the above-referenced improvements for your review and
information. In particular, please direct your attention to Sheets 3, 4, 5 and 9,
which depict our plans for the improvements to the 59th Street emergency exits.
In a February 29, 1984 submittal to your office, our consultant preposed
schemes that included new column footings located close to the tops of two
existing brick-lined sewers at the 59th Street emergency exits. After reviewing
said submittal, your office reccanmended that "...the column loads be transmitted
to the subgrade of the sewer through seme type of a load-transfer mechanism..."
Together with our consultant, we have investigated and developed a design
alternative that has been incorporated into the enclosed final drawings. This
alternative abandons the previous scheme of introducing new columns and footings
and rather, places new and stronger beams/girders above with the removal of
existing columns. This will give us the necessary headroom and other clearances,
support ceiling loads adequately and eliminate the problem of disturbing the
existing sewers.
We will soon be advertising this project for bids and expect work to be
completed by September 1985. If we do not hear from your office within the next
two (2) weeks, we will presume that the alternative presented in the final
drawings is satisfactory.
qca3
NYC-WTC_000165422