NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/Street Improvement No. 7 World Trade Center
Document / 1 page

Internal memo with redacted text, July 1986

Machine-extracted title · confidence 75%

Fragmented internal document from DEP regarding the World Trade Center project with a July 29, 1986 date stamp.

NYC-WTC_000165761

Folder label: “Street Improvement No. 7 World Trade Center

Page image
Scanned page image, NYC-WTC_000165761
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Parsons f fyhe Penn Plaza Brlneksrho^ New York, NY 10119 100 routs OuaOsA 212-613-5000 Douglas, Ine. Engineers Planners Cable: Parklap, New York July 9, 1986 Telex: RCA 232 117 PKLP UR

Mr. Magdi Parag, P.E. Chief, Division of Sewer Regulation and Control 40 Worth Street Room 922 New York, NY 10013

Re: Amtrak Tunnel Extension

Dear Mr. Farag:

Amtrak has proposed to extend their existing single track from the vicinity of 33rd Street to the vicinity of 38th Street by a combination of a tunnel, open cut and at grade construction. The preliminary concepts for this re­ location were prepared by others, and we are now preparing the contract doctunents for this extension.

The proposed plan of the extension, shown on Fig. 1, will require relocation of the combined sewers located in 33rd and 34th Streets along llth Avenue. The tunnel grade at this location is about 13 ft. below the inverts of the existing sewers. Previous studies of this relocation by others, have indicated the use of a siphon to accomplish the relocation at both 33rd and 34th Streets.

We would appreciate reviewing with you existing sewer information, the project configuarations, the: requirements for combined sewer relocations, the require­ ments for use of a siphon and the submittals and reports needed for approval of any proposed relocation. To implement this process, we suggest a brief meeting to provide an opportunity to exchange information and to set the stage for future formal submittals. To set this meeting please call me as soon as possible at (212) 613-5155 or Mr. Erez Sela at (212) 613-5159.

We appreciate your cooperation in this most interesting and challenging project.

Very truly yours.

PARSONS ^INCKERHOK IE & DOUGLAS, INC.

Ge^ge r/ Olige/, *P.^ ^sist^t Vice Presipen -^RECEIVeO D.E.P./BUREAU OF SE’* rm i JUL 1 U »* i} DIVISION’ SEWFR R‘ a;

AConturyof Engln00rlng Bxcollanco

NYC-WTC_000165761

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165761Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165734 · Box DEP Box 44

Letter submitting revised pavement plans addressing catch basin placement and storm drainage connections at Vesey Street.

Filed in the same folder

Compare copies and versions →