DEP comments on Liberty Street modifications, Sept 1987

Machine-extracted title · confidence 90%

Letter providing engineering comments on proposed catch basin removal and construction for the Route 9A modification project.

NYC-WTC_000165451–000165452

Folder label: “Rockefeller Laboratory E. 67th St.”

Page image
Scanned page image, NYC-WTC_000165451
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NEW YORK CITY DEPARTMENT OF TRANSPORTATION 40 Worth Street • New York, N.Y. 10013 M-DAC/CC-TBS-GFR-685

Ross Sandler JOHN McTIGUE, P.E. Commissioner Assistant Cc Issloner

Arterial Highways;, Bridge & Tunnel Operations AU6111987 Bureau of Highway Operations - Manhattan Maintenance Department of Transportation - Detour Implementation Group Bureau of Traffic Operations t Highway Design . Bureau of Traffic Operations - Manhattan Borough Engineer Division of Plans & Surveys Police Department - Traffic Fire Department - Operations Dept, of Env. Protection - Sewer Regulations & Control Dept, of Env. Protection t Bureau of Water Supply Division of Street Lighting/Signals Borough President’s Office - Manhattan Mayor’s Office of Construction NYS Dept, of Transportation -r Foster Beach III, Regional Director NYS Dept, of Transportation - Design/Constructloii Project Manager Office of Construction Coordination - Arterial Highways Office of Construction Coordination - MTGCC East River Coordinator Consultant Engineers V<^®er Associates

3B jsr Re: Battery Park City Authority Proposed Modifications to Marginal St. from Liberty St. to Chambers St. Borough of Manhattan

8^ \ S Meeting to Receive City Agency CoTilingents oil Advance Detail Flans R Gentlemen: O

Transmitted under separate cover on July 21, 1987 by: Vpllmer Associates, Consultant Engineers for the Battery Park City Authority,>was/wete_3-_^vllZparfeUl- set(s) of the advance detail plans for the above noted project.' Your review of this submission is requested. A meeting has been scheduled fW TiMMSy, August^^ 25,. 1987, at 10:00 AM Room 412,'..SI Chambers St., to receive your input and comments on this submission.

Your cooperation in reviewing the project and supplying coEhhI mts Is most appreciated.

- Very t^y

1 GERARD F/ ErafIN6ER>R<M. Director Arterial Highways Coordination

NYC-WTC_000165451

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165451Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

DOT cover sheet for WTC utility relocation project · Box DEP Box 44

NYC-WTC_000165066

Cover sheet from the Department of Transportation Bureau of Transportation Planning and Research listing agencies involved in the World Trade Center utility relocation.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.927

machine-extracted · confidence unavailable · Check page ↗
DEP response to 95% plan submittal, Dec 1983 · Box DEP Box 44

NYC-WTC_000165824

Department of Environmental Protection letter acknowledging receipt of 95% plans and referring comments previously sent to the consulting engineers.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.913

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →