NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/DEP Box 44/Rockefeller Laboratory E. 67th St.
Document / 2 pages

DEP comments on Liberty Street modifications, Sept 1987

Machine-extracted title · confidence 90%

Letter providing engineering comments on proposed catch basin removal and construction for the Route 9A modification project.

NYC-WTC_000165451–000165452

Folder label: “Rockefeller Laboratory E. 67th St.”

Page image
Scanned page image, NYC-WTC_000165452
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NEW YORK CITY DEPARTMENT OF TRANSPORTATION 40 Worth Street • New York, N.Y. W013

SI-DAC/CC-GFR-685 Ross Sandler JOHN McTIGUE, P.E.' Commissioner Assistant Commissioner Arterial Highways, Bridge & Tunnel Operations Bureau of Highway Operations - Bridge Design Bureau of Highway Operations Borough Maintenance AUG 12 igsy Bureau of Highway Operations - Bridge Maintenance Department of Transportation - Detour Implementation Group Bureau of Traffic Operations - Highway Design Bureau of Traffic Operations - Staten Island Borough Engineer Police Department - Traffic Fire Department - Operations Regulations & Control Division of Street Lighting/Signals Borough President’s Office - Staten Island Coliiliitiunity Board #1 & 2 Mayor’s Office of Construction NYS Dept, of Transportation - Foster Beach III, Regional Director NYS Dept, of Transportation - Desigh/Construction, Project Management Office of Construction Coordination - Arterial Highways Office of Construction Coordination - MTCCC Re: PIN X349.09 Staten Island Expy. Service Road Intersection Improvements Clove Road and Targee St. ; Borough of Staten Island Meeting to Receive City Agency Comments on Advance Detail Plans

Gentlemen: Transmitted under separate cover on August 16, 1987 by the: New; York State Department of Transportation, .was/wer^^^^ull/^ertlalTset(s) of the advance detail plans for the above noted project. Y<mr review of this submission is requested.

A meeting has been scheduled for Thursday September 10, 1987 at 10:00 AM in Room 412, 51 Chambers St., to receive input and coWTiTants on this submission. Your cooperation in reviewing the project and supplying cohuiiEsnts is appreciated. truly

F. director Arterial Highways Coordination

NYC-WTC_000165452

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165452Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

DOT cover sheet for WTC utility relocation project · Box DEP Box 44

NYC-WTC_000165066

Cover sheet from the Department of Transportation Bureau of Transportation Planning and Research listing agencies involved in the World Trade Center utility relocation.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.927

machine-extracted · confidence unavailable · Check page ↗
DEP response to 95% plan submittal, Dec 1983 · Box DEP Box 44

NYC-WTC_000165824

Department of Environmental Protection letter acknowledging receipt of 95% plans and referring comments previously sent to the consulting engineers.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.913

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →