Revised pavement plans for World Trade Center No. 7, Feb

Machine-extracted title · confidence 94%

Transmittal of revised pavement plans retaining existing catch basins and adjusting grates to meet proposed grades.

NYC-WTC_000165735–000165736

Folder label: “Street Improvement No. 7 World Trade Center

Page image
Scanned page image, NYC-WTC_000165735
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Vollmer Associates 11 West 19th Street New York NY 10011 212 691 3800

February 26, 1987 q.ep.lBUatAJ

VEB 7. / Mr. Douglas Smith Bureau of Sewers 40 Worth Street New York, NY 10013 Re: 7 World Trade Center Pavers Plans Borough of Manhattan Dear Mr. Smith:

We are submitting herewith three (3) sets of revised pavers plans in response to the comments made in your letter of January 26, 1987 and at our meeting of February 6, 1987. The plans are revised as follows:

1. The existing catch basin at the northeast corner of Vesey Street and Washington Street north of the PC will remain in place. As discussed the existing grate will be retained and adjusted to meet the proposed grades. There will be no conversion to a manhole casting. Also the existing 12" DIP connection to the manhole shall be cleaned.

2. The proposed catch basin in the vicinity of the location mentioned in item (1) above shall be connected to the existing manhole with a new 12" ductile iron pipe. The existing 12 inch pipe and catch basin will be removed. As noted at our meeting we feel that it will not be physically possible to locate this new basin east (upstream) of the pedestrian cross walk because of utility conflicts (168-4" telephone conduits). Mr. La Greca of NYCDOT, Bureau of Highway Operations, concurred with the location of catch basins shown on the Pavers Plan. We've asked Jerry Blaustein of the Builders Pavers Section to contact Ms. Doss of your office to confirm this. 3. The existing 12" DIP connection from the existing manhole to the main sewer in Vesey Street shall be cleaned as part of the construction (see Note 'E' on Drawing B-2 of the Pavers Plan). 4. Reference to the proposed 10" "house connection" accommodating storm drainage from the pedestrian bridge has been removed from the plans.

>-■^1

An Equal Opportunity Employer

NYC-WTC_000165735

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000165735Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

DEP letter re WTC river intake plans, Oct 1982 · Box DEP Box 44

NYC-WTC_000165098

Department of Environmental Protection letter dated October 25, 1982, providing comments on revised plans for relocating river water intake lines at the World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.916

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165734 · Box DEP Box 44

Letter submitting revised pavement plans addressing catch basin placement and storm drainage connections at Vesey Street.

Filed in the same folder

Compare copies and versions →