HVAC estimate cover sheet, May 1998 · page 1NYC-WTC_000172698
Fax cover sheet from Penguin Air Conditioning submitting an HVAC estimate for the Mayor's Office on floors 1, 7, and 23 at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
HVAC pricing fax cover sheet, May 1998 · page 2NYC-WTC_000172699
Fax cover sheet from an air conditioning contractor regarding a pricing estimate for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Feinstein KS Inc. structural steel quote, May 1998 · page 1NYC-WTC_000172733
Formal quotation from Feinstein KS Inc. to the Mayor's Office of Emergency Management for structural steel and metal decking at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fire sprinkler proposal cover sheet, May 22, 1998 · page 1NYC-WTC_000172762
Cover page of a bid proposal from Active Fire Sprinkler Corp. for work at the New York Naval Shipyard Building Fifty.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax cover sheet from Steelcraft, June 1998 · page 3NYC-WTC_000173050
Fax cover sheet from Steelcraft transmitting documents regarding folding gates and fire doors.
Citywide Administrative Services, Dept. of · Box 7DCAS
Bid comparison sheet for 7 WTC project items, 1998 · page 1NYC-WTC_000173103
Spreadsheet comparing costs from three bidders for door installation and other construction items at the 7 World Trade Center project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Project cost summary with addenda and fees, 1998 · page 2NYC-WTC_000173113
Financial summary listing original bid, generator costs, electric tapping fees, and total project costs for a City facility upgrade.
Citywide Administrative Services, Dept. of · Box 7DCAS
Unit price schedule for security equipment, RBSAM · page 1NYC-WTC_000173160
Unit price schedule from RBSAM listing costs for relay boxes, switches, conduit, and security system components.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised change order #004, 7 World Trade Center, September 1998 · page 2NYC-WTC_000173175
Revised change order from Ambassador Construction Co. Inc. for concrete work and panel capacity changes at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Security system specification excerpt, May 1998 · page 1NYC-WTC_000173219
Technical specification document detailing end-of-line resistor wiring requirements for the Mayor's Office of Emergency Management security system.
Citywide Administrative Services, Dept. of · Box 7DCAS
Security system specification excerpt, May 1998 · page 2NYC-WTC_000173219
Technical specification document detailing end-of-line resistor wiring requirements for the Mayor's Office of Emergency Management security system.
Citywide Administrative Services, Dept. of · Box 7DCAS
HVAC specification supplement, unknown date · page 1NYC-WTC_000173223
Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #004 for MOEM work, September 1998 · page 2NYC-WTC_000173271
A revised change order detailing scope changes and costs for the Mayor's Office of Emergency Management renovation project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #004 for MOEM work, September 1998 · page 2NYC-WTC_000173274
A revised change order detailing scope changes and costs for the Mayor's Office of Emergency Management renovation project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Bulletin #1: Port Authority comments on MOEM work, undated · page 2NYC-WTC_000173277
A document listing Port Authority comments and associated cost adjustments for the Mayor's Office of Emergency Management renovation.
Citywide Administrative Services, Dept. of · Box 7DCAS
Bulletin #1: Port Authority comments on MOEM work, undated · page 3NYC-WTC_000173279
A document listing Port Authority comments and associated cost adjustments for the Mayor's Office of Emergency Management renovation.
Citywide Administrative Services, Dept. of · Box 7DCAS
Cost estimate for hurricane wall dampers and electrical work, undated · page 2NYC-WTC_000173285
A cost breakdown for furnishing and installing motorized dampers and electrical components in the hurricane wall at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Work cost estimates, Mayor's OEM, 7 WTC, July 1998 · page 2NYC-WTC_000173287
Cost estimate sheet detailing work items for oil tank cradle and electrical panel upgrades at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #004, Sept 1998 · page 2NYC-WTC_000173309
Letter from Ambassador Construction submitting a revised change order for work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Door schedule specifications, Office of Emergency Management, 1998 · page 11NYC-WTC_000173374
Architectural specification sheet detailing door models, dimensions, fire ratings, and security features for the OEM facility.
Citywide Administrative Services, Dept. of · Box 7DCAS
Door schedule specifications, Office of Emergency Management, 1998 · page 14NYC-WTC_000173374
Architectural specification sheet detailing door models, dimensions, fire ratings, and security features for the OEM facility.
Citywide Administrative Services, Dept. of · Box 7DCAS
Bulletin #1 regarding Hurricane Wall work at 7 World Trade · page 1NYC-WTC_000173408
Bulletins detailing costs for hurricane wall construction, column reinforcement, and sheetrock installation at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #004, 7 World Trade Center, Sept 1998 · page 4NYC-WTC_000173445
Ambassador Construction submits revised change order for electrical and concrete work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Letter regarding Change Order #004, August 1998 · page 4NYC-WTC_000173453
Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Revised Change Order #004, 7 World Trade Center, September 1998 · page 2NYC-WTC_000173458
Letter submitting a revised Change Order #004 for concrete and electrical work at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Plan Review Comments, 7 World Trade Center, 1998 · page 2NYC-WTC_000173475
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Plan Review Comments, 7 World Trade Center, 1998 · page 5NYC-WTC_000173475
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
23rd floor punch list, 7 WTC, June 1999 · page 7NYC-WTC_000173500
Comprehensive punch list compiled by the Mayor's Office of Emergency Management following site inspections of the 23rd floor at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
23rd floor punch list, 7 WTC, June 1999 · page 21NYC-WTC_000173500
Comprehensive punch list compiled by the Mayor's Office of Emergency Management following site inspections of the 23rd floor at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice from SuperCircuits for camera equipment, Dec 1998 · page 1NYC-WTC_000173565
Invoice dated December 29, 1998 from SuperCircuits for PC camera equipment supplied to the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Invoice from Supercircuits for 7 WTC, Dec 1998 · page 1NYC-WTC_000173567
Invoice dated December 29, 1998 from Supercircuits for camera equipment supplied to the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
RFI log for 7 WTC EOC project, July-August 1998 · page 2NYC-WTC_000173590
Request for Information log documenting responses to queries about wall offsets and dimensions at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
RFI log for 7 WTC EOC project, July-August 1998 · page 3NYC-WTC_000173590
Request for Information log documenting responses to queries about wall offsets and dimensions at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
RFI log for 7 WTC EOC project, July-August 1998 · page 4NYC-WTC_000173590
Request for Information log documenting responses to queries about wall offsets and dimensions at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Consultant meeting minutes #7, 7 WTC, September 1998 · page 2NYC-WTC_000173597
Minutes of the seventh consultant meeting held at 7 World Trade Center on September 1, 1998 for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
Consultant meeting minutes #7, 7 WTC, September 1998 · page 2NYC-WTC_000173600
Minutes of the seventh consultant meeting held at 7 World Trade Center on September 1, 1998 for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
RFI log for 7 WTC EOC project, September 1998 · page 2NYC-WTC_000173607
Request for Information log tracking queries and responses regarding wall offsets and wet columns at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
RFI log for 7 WTC EOC project, September 1998 · page 3NYC-WTC_000173607
Request for Information log tracking queries and responses regarding wall offsets and wet columns at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
RFI log for 7 WTC EOC project, September 1998 · page 4NYC-WTC_000173607
Request for Information log tracking queries and responses regarding wall offsets and wet columns at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
RFI log for 7 WTC EOC project, September 1998 · page 2NYC-WTC_000173615
Request for Information log tracking queries and responses regarding wall offsets and wet columns at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
RFI log for 7 WTC EOC project, September 1998 · page 3NYC-WTC_000173615
Request for Information log tracking queries and responses regarding wall offsets and wet columns at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
RFI log for 7 WTC EOC project, September 1998 · page 4NYC-WTC_000173615
Request for Information log tracking queries and responses regarding wall offsets and wet columns at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
RFI log for 7 WTC EOC project, September 1998 · page 2NYC-WTC_000173623
Request for Information log tracking queries and responses regarding wall offsets and wet columns at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
RFI log for 7 WTC EOC project, September 1998 · page 3NYC-WTC_000173623
Request for Information log tracking queries and responses regarding wall offsets and wet columns at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
RFI log for 7 WTC EOC project, September 1998 · page 4NYC-WTC_000173623
Request for Information log tracking queries and responses regarding wall offsets and wet columns at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Minutes of Consultant Meeting #10 for 7 WTC, Sep 1998 · page 1NYC-WTC_000173638
Record of a consultant meeting held on September 22, 1998, regarding safety reviews and project updates for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax transmission log for 7 WTC project, Jan 1995 · page 4NYC-WTC_000173652
Log of incoming and outgoing faxes between Ambassador Construction and the Office of Emergency Management regarding project communications.
Citywide Administrative Services, Dept. of · Box 7DCAS
Fax transmission log for 7 WTC project, Jan 1995 · page 4NYC-WTC_000173665
Log of fax transmissions between Ambassador Construction and the Office of Emergency Management regarding project communications.
Citywide Administrative Services, Dept. of · Box 7DCAS
Document log for steel supports and fixtures at 7 WTC, · page 1NYC-WTC_000173670
Log listing submittals including new steel supports, concrete pads, and fixture locations for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
Job memorandum regarding OEM damper RFIs, Aug 1998 · page 1NYC-WTC_000173737
Response to RFI inquiries clarifying that specific dampers are not part of the smoke control system, dated August 10, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS