PROJECT MONITOR LOG
,~ ? L 4. Project #: 5. Work Area(s)'
Part 1
,.f '.
3. Project Address: 4a. Task #:
%'G Y~ f / c
6. Contractor: 7. Contractor's Foreman: 8. ATC Iepreseçftativej 9. Date:
Type of Project: -- Full-Containment Tent-Containment Glovebagging Other
Size of Project: __ Large (> 160 sq. ft., 260 lin. ft. of ACM) Small (< 160 sq. ft., 260 lin. ft.)
Phase of Abatement: Pre-abatement Sampling Prep Removal aning
Encapsulation Waste Load-out Finals
FULL-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section): /_/6a-' — ? LL. ,tti- .. T - y .-
Preparation of Work Area: Yes (Indicate prep work performed in 1 - 10) N/A (If already completed)
(I Yes
1. Construction of Decon: . "s No 2. Ceiling Poly:
3. Critical Barriers (CBs): Yes -. No 4. Wall Poly: __ Yes No
5. Removal to establish CBs: Yes No 6. Floor Poly: Yes No
7. Negative air: Yes No 8. Pre-cleaning: Yes No
9. Prep work completed: 'Yes No 10. Temporary Power: Yes No
11. Other Yes No 12. Prep-Inspection Passes: Yes No (Explain why)
Removal: Yes (Complete I - 5) N/A
1. Type of ACM: Pipe Insulation _ Duct Insulation Fireproofing Ceiling Tile
Boiler Insulation Transite Boards Floor Tile Other: ~ a-µ--►
2. Negative air pressure ≥ 0.02 in. of water: __ Yes No 3. Amended water used during removal: Yes No
4. Critical barriers intact for shift's duration: Yes — No 5. Proper Decon procedures followed: Yes No
Cleaning: Yes (Complete 1 - 6) N/A
1. 1st Stage 2nd Stage 3rd Stage 2. 12/12-hour waiting period after 1st cleaning:
3. Removal of 1st poly layer after 1st cleaning: Yes No 4. 4/12-hour waiting period after 2nd cleaning: Yes No
5. Removal of 2nd poly layer after 2nd cleaning: Yes No 6 1/12-hour waiting period after 3rd cleaning:
Yes No
TENT-CONTAINMENT ABATEMENT
Work Area Location (floor, room, section): _
Preparation of Work Area: Yes (Indicate performed in 1 - 6) N/A (If already completed)
1. Construction of Tent: Yes No 2. Pre-cleaning: __ Yes No
3. Construction of Decon: Yes No 4. Negative Air: Yes No N/A
5. Prep work completed: Yes No 6. Pref-inspection passes: _ Yes No
Removal:
1. Type of ACM: Pipe Insulation Duct Insulation Fireproofing _ Ceiling Tile
Boiler Insulation Transite Boards Floor Tile _ Other:
2. Method or Removal: Gross removal within tent Glovebag removal within tent (check 3 through 8)
El] (If Glovebag Removal Check 3 through 8)
3. Glovebags smoke-tested:
_
Yes
Yes
No
No
4. Glovebags attached to smooth surface: Yes
6. Removal included cleaning and encapsulation:__ Yes
No
No
5. Amended water used:
7. Open/damaged ends of insul. sealed: Yes No 8. Glovebags vacuumed, double-bagged. Yes No