"06/25/99 09:28 FAX 2122190256 SffANKE HAYDEN CONNELL 0005/005

! II Punch List (Company Nan|e) Date : Page 4 I

Repair thermal insulation around blank louver _____________ __ Clicck that perimeter fin tube is heat traced._____________________________ Patch wall next to pre-action panel and install corner beads. OEM Firsi Floor Patch cone, block wall at conduits. _________________________ J Relocate sprinkler head in conflict with location of fire shutter._________ Integen system controls not complete. Fire shutter not installed. Install nCw 3 hr fire rated dOOrs. Build cone, curb 4'-0'' h around duct & pipe penetrations._________ Install 3 hr lire hatch and ladder. Install new flooring and base. Integen heads and smoke detectors not installed.________________ ___ Loading Doc!l|: Install sign ("Not for fire fighting equipment") at fill inlet for water tank at loading dock) T* Floor wate r Ri>waterproof entire floor. tankim. Install leak detection tape sensor, and complete electric installation___________ Door closers not operational_________________________________________ Firestop pipes above door.__________________________________________ Generator Rm. Louver from exhaust has large open gap needs to be caulked and secured properly. (Room must be air light) Caulk around all water louvers. Insulate behind fixed louvers.________________________________________ Seal around generator vent pipes in exhaust plenum, pack all joints around pipes. Caulk all joints at sheet metal not all caulked around column and behind colunm s at window frame.____________________ __ _______________________ I Seal all joints around exhaust pipes____________________________ ____ ______ Patch wall near entrance doors to room around outlets and light switch.

I w:Ui7(,'UiSaemiliics\p>xicUiR\»9.[l6.22.pundili«.ilac

Swanks Hayden Connell Ltd/Swonke Hayden CoiumII A Panner? LLP 295 Lafayette SueeL New Yoifc New Yoik 10012 212 226 9696, Fax 212 219 OOsO

NYC-WTC_000171240

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171240Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

23rd floor punch list, 7 WTC, June 1999 · Box 7DCAS

NYC-WTC_000173500

Comprehensive punch list compiled by the Mayor's Office of Emergency Management following site inspections of the 23rd floor at 7 World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.915

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000167290 · Box 7DCAS

Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.

Filed in the same folder

Compare copies and versions →