March 9, 1’999
i
!
Plumbing:
■* Fix the automatic hot water dispenser (from leaking upon usage) in the cafeteria.
Check to assure tne unit is working properly in the Mayor’s pantry.
• Goii'iplete iimkillutiorrof all fixtures in tho ADA bathieom (adjaeeeKo-fhS’press^ j
room) and assure-the functionality of the facility Test and assure Wie operation of - j 1
the circulator pump from the twenty-third floor to the seventh floor 11,000 gallon i/ \ i
water storage tank. —
Y//* Correct erratic climate control throughout the 23"^ floor.
Electricals
X• Complete the seventfi floor switch gear, generator installation and operability of
\ Ao emergency backup system. Test run the generators under load and test ATS
Y (automatic transfer switches).
vz^ Complete conduit 'work for completion of A/V press feed on first floor.
Inspect and correct numerous light outages and defective ballast in the haltways
and Mayor’s Corrierence room.
Carpentry:
•/rinstall door-stops to limit the opening of doors and reduce the number of door
handles penetrating the sheetrock walls.
i
• Install door opening and closing devices to limit ttie “whipping” action of doors
located in the following areas;
1. Mayor's Suite Eintrance
2. Director’s Conference Room
3. Watch Command entrance from the EOC.
4. Room 23-17
• Complete thirteen '‘Marlite panete"intheEOC.
?• Complete Installation
Conference taWe. Items
/ data faceplates in the Mayor's
(anticipated two to tour week delivery.)
^^zConstruction: Complete the installation of the fuel line from 1 * floor to 7* floor.
• Page 2