Engineer's form requesting verification of tank placement and clearance compliance with NYC code at the facility.
Same agency, volume and box · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗Memo requesting verification that a 6000-gallon tank installation meets NYC code clearance requirements.
NYC-WTC_000167817–000167819Folder label: “General Design Review Comments”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
PlSKtaTlW Qypo
zaMl Dep’t Citywide Administrative Services To: Glenn Pymento Sheet 1 of 3 A: Incorporated Contract Number: Consultant: Consentini Ass. B:Not Inc^^ijorated Description: Mayor's Office Of Emergency 100 % Submittal Management. explanation) Reviewer: JOSEPH Title Mechanical Date: 4/17/98 C: Clarification MENASCE, PE Engineer. II Required COWENT Dwg. No/ No. Spec. Po. Comments
_____________________________ HVAC_____________________________ 1 A-l-l Please verify that the 6000 gal tank can be brought inside the building, rigged in place, that there is enough room for the welder to work, that it is in compliance with NYC code section 27-829 which requires a 15" clearance all around tank and that it is in compliance with NYS code. Subchapter B, part 1002._______________________________________________________ 2 A-l-l Note #1: Water line is shown on-the plumbing drawing.__________________ 3 Ml.Ol 1. What protection is provided against fill pump cavitation in the illustrated fuel oil diagram? 2. Specify the size of the day tank on the drawings or in section 15190. Specify the make and model of the circulating pump for the generators. 3. Shouldn't the vent line for the new emergency fuel tank be higher than the tank? 4. Shouldn't the fuel oil return from the day tank be drained to the new storage tank? 4 Ml.07 Verify with the Generator manufacturer the required opening to air cool the units?__________________________________________________________ 5 M-1.23 I. Are the Air Handlers in the building serving the 23rd floor on emergency generators as well? 2. Specify the make, model and size of the cooling towers. 3. Clarify in the schematic diagram the location of the backflow preventers to supply make up water to the cooling towers. 4. Verify the need to have exhaust fans for the other conference rooms, like the one facing Versey Street. 5. Clarify the need to provide fresh air intake to AC-4 &5. Describe how to achieve free cooling.
Page 1 of 3
NYC-WTC_000167817
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000168712
Engineer's form requesting verification of tank placement and clearance compliance with NYC code at the facility.
Same agency, volume and box · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000169716
Technical review comments on final architectural plans for the Mayor's Office of Emergency Management at 7 World Trade Center.
2 shared non-person entities · Same agency, volume and box · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173475
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167800
Engineer's comments on fire protection systems for the Mayor's Office of Emergency Management renovation at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167813
Letter from DCAS reviewing Final Plans for the Mayor's Office of Emergency Management renovation and requesting consultant revisions.
1 shared topics · Same agency, volume and box · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173012
Detailed inspection report listing required repairs for doors, sprinklers, and electrical fixtures in the Mayor's Office.
1 shared non-person entities · Same agency, volume and box · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173223
Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167723
Attachment B listing Mayor's Office of Emergency Management comments on fire separation and structural adequacy for a new fuel oil tank.
1 shared topics · Same agency, volume and box · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173489
Urgent memorandum from the Mayor's Office of Emergency Management requesting completion of fiber optic press feed and A/V equipment at 7 World Trade Center.
1 shared non-person entities · Same agency, volume and box · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168708
Letter from the Division of Real Estate Service notifying the Mayor's Office of Emergency Management that final plans for 7 World Trade Center have been reviewed.
Same agency, volume and box · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166458
Memo from the Fire Department explaining mandatory filing of MSDS and forms for facilities storing hazardous substances.
1 shared non-person entities · 1 shared topics · similarity 0.914
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000168712
Engineer's form requesting verification of tank placement and clearance compliance with NYC code at the facility.
Similarity score 0.984 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000169716
Technical review comments on final architectural plans for the Mayor's Office of Emergency Management at 7 World Trade Center.
Similarity score 0.981 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167800
Engineer's comments on fire protection systems for the Mayor's Office of Emergency Management renovation at 7 World Trade Center.
Similarity score 0.962 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167723
Attachment B listing Mayor's Office of Emergency Management comments on fire separation and structural adequacy for a new fuel oil tank.
Similarity score 0.951 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000170832
DCAS approval of architectural and mechanical engineering services proposal for Office of Emergency Management emergency systems and equipment at 7 World Trade Center.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000167800
Engineer's comments on fire protection systems for the Mayor's Office of Emergency Management renovation at 7 World Trade Center.
Filed in the same folder
Engineer's form requesting verification of tank placement and clearance compliance with NYC code at the facility.
Filed in the same folder
Technical review comments on final architectural plans for the Mayor's Office of Emergency Management at 7 World Trade Center.
Filed in the same folder
NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
Similar indexed content
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
Similar indexed content