7 World Trade Center legal correspondence, Apr 2002

Machine-extracted title · confidence 65%

Letter from law firm to City regarding administrative matter related to 7 World Trade Center.

NYC-WTC_000173529–000173538

Folder label: “7 World Trade Center, Manhattan Freedom of Information Request

Page image
Scanned page image, NYC-WTC_000173536
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Sass

Dep^t Citywide Administrativ e Services Genera! Design Review Comme nts To: Glenn Pymento Sheet 1 of 3 A: Iccorpont Contract Number: Cotmiltani: Conseniini Ass. B:Kot Itic^^>ralcd Description; Mayor's Office Of Emergency 100 % Submittil ManagcmcnL cxplanatxoa) Reviewer: JOSEPH • Tide Mechanical Date; 4/17Z9S C: Clarificaii' MENASCE, PE Engineer. Required CdttSBX DW5. 1^71 Comments No. Spec , Pc.

________ _________________ HVAC____________________ _ 1 A-1-1 Please verify that the 6000 gal tank can be brouf ht inside the bullding,” rigged in place, that there is enough room for tiW welder to work, that it is in compliance with NYC code section 27-S29 whic h requires a 15" clearance all amund tank and that it is in corapUance with' 'TVS code, Subchapier B, part 1002.____________ '________________________ 2 A-1-1 Note #l~Water line is shown on-tfae plumbing drawing.-_______________ 3 MI.OI 1. What protectioa is provided against fill puxnf cavitation in the illustrated foci oil diagram? 2. Specify the size of the day tank on the drawirgs or in section 15190. Specify the make and model of the circulating' pump for the generators. 3. Shouldn't the vent line for the new emergency'fuH tank be higher than the tank? i . 4- Shouldn't tire fuel oil return from the day tank; be drained to the new storage tank?_______________________ _______________ ____ 4 Ml.07 Verify witii the GenerMor manufecturer the required opening to air cool the units? 5 M-1J3 1. Arc the Air Handlers in the buildmg serving 23rd floor on ergency generators as well? 2. Specify the make,, model and size of the coolir g towers. 3. Clarify in the schematic diagram the location c f the backflow preventers to supply make up water to the cooling towers, 4. Verify the need, to have exhaust fans for the ot icr conference rooms, like the one facing Verscy Street. 5. Clarify the need to provide ftesh air intake to 21.0-4 &5. Describe how to achieve free cooling.

P^gfi 1 of 3

NYC-WTC_000173536

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173536Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Plan Review Comments for 7 WTC, April 1998 · Box 7DCAS

NYC-WTC_000169716

Technical review comments on final architectural plans for the Mayor's Office of Emergency Management at 7 World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.953

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000169713 · Box 7DCAS

Technical review notes on final construction plans for 7 World Trade Center addressing travel distances and mechanical room details.

Similar indexed content

NYC-WTC_000173475 · Box 7DCAS

Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →