Dep^t Citywide Administrativ^ Services
Generol Design Review Comments
To; GlennPymento Sheet I of 3 1 A: Incoipmac:
Contract Number; Consxiltant: Consentini B:Not
Inc^^nnted
Description: Mayor's Office Of Emergency 100 VoSubmii
Management explanation)
Reviewer: JOSEPH Title Mechanical Date; 4/17Z9S C: Clarificatio:
MENASCE, PE Engineer. Required
OOftHC IWO. NO/
Spsc , Pg ,
COMMZNTS
ITo.
_________ ________________ HVAC
.1 A-1-1 Please verify that the 6000 gai tank can be inside the balding.
rigged in place, that there is enough room for the welder to work, that it is in
compliance with NYC code section 27-S29 whic h requires a 15" clearance
all around tank and that it is in compliance with' <YS code, Subchaptcr B,
part 1002.____________ _______ __________
2 A-1-1 Note #1; Water line is shown on-t^ plumbing drawing.-
3 MLOl 1. What protection is provided against fill puny cavitatioii in the illustraxed
fuel oil diagram?
2. Specify the sine ofths day tank on. the drawixgs or in section 15190.
Specify the make and model of the circulatinj; pump for the generators.
3. Shouldn't the vent line for the new emergency fud tank be higher than
ihetank?
4. Shouldn’t the fuel oil return &om the day tank be drained to the new
storage tank?_________________________
4 Ml.07 Verify with the Generalcr manufocturer the requu^ opening to air cool the
units? _________________________ ________________ ■
5 M’1.23 1. Arc the Air Handlers in the building serving tlfe 23rd floor on emergency
generators as well?
2. Specify the make, model and size of the coolit g towers.
3. Clarify in the schematic diagram the location < >f the backflow preventtrs
to supply make up water to the cooling towers
4. Verify the need to have exhaust fans for the ot icr conference rooms, like
the one facing Verscy Street.
5. Clarify the need to provide fresh air intake to >10-4 &5, Describe how
to achieve free cooling.___ _______________
Page 1 of 3
NYC-WTC_000169716
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000169716Source: NYC Law Department, mirrored locally
Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.923
Letter from the Division of Real Estate Service notifying the Mayor's Office of Emergency Management that final plans for 7 World Trade Center have been reviewed.
1 shared topics · Same agency, volume and box · similarity 0.913