NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/General Design Review Comments
Document / 3 pages

Plan Review Comments for 7 WTC, April 1998

Machine-extracted title · confidence 95%

Technical review comments on final architectural plans for the Mayor's Office of Emergency Management at 7 World Trade Center.

NYC-WTC_000169716–000169718

Folder label: “General Design Review Comments

Page image
Scanned page image, NYC-WTC_000169716
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document r.kjr *

Dep^t Citywide Administrativ^ Services Generol Design Review Comments To; GlennPymento Sheet I of 3 1 A: Incoipmac: Contract Number; Consxiltant: Consentini B:Not Inc^^nnted Description: Mayor's Office Of Emergency 100 VoSubmii Management explanation) Reviewer: JOSEPH Title Mechanical Date; 4/17Z9S C: Clarificatio: MENASCE, PE Engineer. Required OOftHC IWO. NO/ Spsc , Pg , COMMZNTS ITo.

_________ ________________ HVAC .1 A-1-1 Please verify that the 6000 gai tank can be inside the balding. rigged in place, that there is enough room for the welder to work, that it is in compliance with NYC code section 27-S29 whic h requires a 15" clearance all around tank and that it is in compliance with' <YS code, Subchaptcr B, part 1002.____________ _______ __________ 2 A-1-1 Note #1; Water line is shown on-t^ plumbing drawing.- 3 MLOl 1. What protection is provided against fill puny cavitatioii in the illustraxed fuel oil diagram? 2. Specify the sine ofths day tank on. the drawixgs or in section 15190. Specify the make and model of the circulatinj; pump for the generators. 3. Shouldn't the vent line for the new emergency fud tank be higher than ihetank? 4. Shouldn’t the fuel oil return &om the day tank be drained to the new storage tank?_________________________ 4 Ml.07 Verify with the Generalcr manufocturer the requu^ opening to air cool the units? _________________________ ________________ ■ 5 M’1.23 1. Arc the Air Handlers in the building serving tlfe 23rd floor on emergency generators as well? 2. Specify the make, model and size of the coolit g towers. 3. Clarify in the schematic diagram the location < >f the backflow preventtrs to supply make up water to the cooling towers 4. Verify the need to have exhaust fans for the ot icr conference rooms, like the one facing Verscy Street. 5. Clarify the need to provide fresh air intake to >10-4 &5, Describe how to achieve free cooling.___ _______________

Page 1 of 3

NYC-WTC_000169716

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000169716Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared topics · Same agency, volume and box · similarity 0.923

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

Fire Service Summary Report, n.d. · Box FDNY

NYC-WTC_000169205

Document summarizing fire service activities or inspections performed at the specified location.

Similar document embedding; no shared entity or topic indexed. · similarity 0.915

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168712 · Box 7DCAS

Engineer's form requesting verification of tank placement and clearance compliance with NYC code at the facility.

Filed in the same folder

NYC-WTC_000173475 · Box 7DCAS

Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →