Plan Review Comments for 7 WTC, April 1998

Machine-extracted title · confidence 95%

Technical review comments on final architectural plans for the Mayor's Office of Emergency Management at 7 World Trade Center.

NYC-WTC_000169716–000169718

Folder label: “General Design Review Comments”

Page image
Scanned page image, NYC-WTC_000169717
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

r.wo iTidJia^emenl hinal $ubm(UaI 6 M-4.01 • Please correct the cooling loads' typograp deal error for AC-I thru 3. * Complete ventilation index. » Will the motor for the exhaust fan EF.S to be explosion proof? 7 Section Paragraph 1.4: Identify shut off vaJvcs VI ihr 14 on the drawinss. W^e 15110 the butterfly and check valves arc being used?} 8 Section Paragraph 1,4: The abbreviation of fusible linirdampcrs (FLD) do not 15120 correlate with drawings (ALP).__________________ 9 Section • Verify paragraph 1.1 item F. ' 15150 » Edit paragraph 1.2 item A. .

Fire prottetion 1 FPl.Ol Please verify the need to provide fire protcctioi i for the Gal Fuel Oil >ir Tank in accordance withNYS code, Subchaptcy B> Part 1002,7. _________ 2 FP2.07 Verify the need to provide thermal detectors in [the emergency diesel ~ generatora room to close off the Fresh Air Intake and exhaust in case of fire. 3 FP3J23 1. Is there a need"for a' preaetJon sprinldcr system for the A/V room? ~ 2. Verify the need to provide sprinklers ik the electrical closet adjacent to elevator shaft PE-18 and stairway. This i oom contains a 112.5KVA trans former. 3. Verify the distances between sprinklers in tl e Mechanical Room and the watch command areas. 4, Verify fte need of the inspectors test conntt: tioa at the end of the sprinkler system. 5. Show the drain lines for the preaction systco^._______ _______ ■ ■ 4 What measure of fire'prot^og is provided for &c radio room on the roof?

_______________________ PLUMBING______________________ 1 P2.07& What provision Is made to minimize disruption o tenants when the cold P3.23 wajd riser will be installed or when the drain tin ts will be run below their su:q>eoded ceilings. ____________ 2 P3.23 Indicate the location of the backfiow preventgr fijr the two cooling towers. • J Section Where do you use a submersible pump? If that h the sump pump for the 15445 tank room what size reservoir is requhed.

_________________ ______ Electrical _____________________ 1 General • Indicate the motor horsepower for each moto? symbol, • Are meters required? • Complete the riser diagram: indicate the loads being served from each panel and the size of rhe breakers. • Indicate the transformers' type of connection a nd voltages as well as their primary switches and fuses, • Can the oil fill pump, the water tank fill pump and the exhaust fan EF-5 on the 1st floor, be activated from the dual do ^ric power supply. • Show the automatic power transfer distributioj! to the existing pneumatics controls and to the Air Handling u tit serving the 23rd floor. ♦ Show circuit breakers panel schedule.

Page 2 of 3

NYC-WTC_000169717

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000169717Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared topics · Same agency, volume and box · similarity 0.923

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

Fire Service Summary Report, n.d. · Box FDNY

NYC-WTC_000169205

Document summarizing fire service activities or inspections performed at the specified location.

Similar document embedding; no shared entity or topic indexed. · similarity 0.915

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168712 · Box 7DCAS

Engineer's form requesting verification of tank placement and clearance compliance with NYC code at the facility.

Filed in the same folder

NYC-WTC_000173475 · Box 7DCAS

Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →