NYC 9/11 Public Portal Document
r.wo
iTidJia^emenl hinal $ubm(UaI
6 M-4.01 • Please correct the cooling loads' typograp deal error for AC-I thru 3.
* Complete ventilation index.
» Will the motor for the exhaust fan EF.S to be explosion proof?
7 Section Paragraph 1.4: Identify shut off vaJvcs VI ihr 14 on the drawinss. W^e
15110 the butterfly and check valves arc being used?}
8 Section Paragraph 1,4: The abbreviation of fusible linirdampcrs (FLD) do not
15120 correlate with drawings (ALP).__________________
9 Section • Verify paragraph 1.1 item F. '
15150 » Edit paragraph 1.2 item A. .
Fire prottetion
1 FPl.Ol Please verify the need to provide fire protcctioi i for the Gal Fuel Oil
>ir
Tank in accordance withNYS code, Subchaptcy B> Part 1002,7. _________
2 FP2.07 Verify the need to provide thermal detectors in [the emergency diesel ~
generatora room to close off the Fresh Air Intake and exhaust in case of fire.
3 FP3J23 1. Is there a need"for a' preaetJon sprinldcr system for the A/V room? ~
2. Verify the need to provide sprinklers ik the electrical closet adjacent
to elevator shaft PE-18 and stairway. This i oom contains a 112.5KVA
trans former.
3. Verify the distances between sprinklers in tl e Mechanical Room and the
watch command areas.
4, Verify fte need of the inspectors test conntt: tioa at the end of the
sprinkler system.
5. Show the drain lines for the preaction systco^._______ _______ ■ ■
4 What measure of fire'prot^og is provided for &c radio room on the roof?
_______________________ PLUMBING______________________
1 P2.07& What provision Is made to minimize disruption o tenants when the cold
P3.23 wajd riser will be installed or when the drain tin ts will be run below their
su:q>eoded ceilings. ____________
2 P3.23 Indicate the location of the backfiow preventgr fijr the two cooling towers. •
J Section Where do you use a submersible pump? If that h the sump pump for the
15445 tank room what size reservoir is requhed.
_________________ ______ Electrical _____________________
1 General • Indicate the motor horsepower for each moto? symbol,
• Are meters required?
• Complete the riser diagram: indicate the loads being served from each
panel and the size of rhe breakers.
• Indicate the transformers' type of connection a nd voltages as well as their
primary switches and fuses,
• Can the oil fill pump, the water tank fill pump and the exhaust fan EF-5
on the 1st floor, be activated from the dual do ^ric power supply.
• Show the automatic power transfer distributioj! to the existing
pneumatics controls and to the Air Handling u tit serving the 23rd floor.
♦ Show circuit breakers panel schedule.