A-23-2 - Soffit details need dimensions.
- Ceiling tiles «t bunk bathrooms should be wi ter resistant
- Room 23-15 should have a combination of 2 x 4’ fixtures and
down light
A-23-5 - Why do we have broadloom carpet at offices if it is the same carpet
than tiles?
-Maybe we should have another type of carpe for rooms 23-04;
23-07; 23-10; and 23-15.
- Shouldn’t the Mayor’s elevator lobby have a jctter rubber floor?
Maybe a pattern?
A-48-1 - Detail 9. No dimcasiou for concrete base.
- Room dimensions?
' No steps at the door? Curb is 1’- 3” min. plm flushing.
- An' a dishes should be located.
BH - To show stations at the podium.
- All furniture shall be identified, regardless of i he vendor (i,«. chairs,
desks, beds, couches, etc.).
- Mayor’s office should have the best furniture i n this project, not this
standard station. This was requested at Desigr Development.
D-0 - Doors for mechanical rooms and radio room?
El-01 - Oil tank room. It says: Sec part plan below, w jcrc is it?
• Suction pumps to be install^ above the floodi ig water table.
Do you have this inforination?
S4 - Fuel Oil tank is located between column line 7) & 73, not between
64 & 67 as shown On this drawing.
- Platforms are going to be required for water pu up and F.O. pumps.
S-3 »Movable partition. Beam is x 31; but detai i I says W18 x 31.