NYC 9/11 Public Portal Document
r.
-2-
A-23-2 - Soffit details need dimensions,
- Ceiling tiles at bunk bathrooms should be vw ter resistant
- Room 23-15 should have a combination of 2 x 4’ fixtures and
down light
A-23-5 - Why do we have broadloom carpet at offices if it is the same carpet
than tiles?
- Maybe wc should have another type of carpe jbr rooms 23-04;
23-07; 23-10; and 23-15.
- Shouldn't the Mayor’s elevator lobby have a wtter rubber floor?
Maybe a pattern?
A-4S4 - Detail 9. No dimatsion for concrete base.
• Room dimensions?
’ No steps al the door? Curb is 1 ’• 3" min. plm flushing.
- Antenna dishes should be located.
BFI - To show stations at the podium.
- Ail furniture shall be identified, regardless of i he vendor (i.e. chairs,
desks, beds, couches, etc.).
- Mayor’s office should have the best furrdture i n this project, not this
standard station. This was requested at Desigr ^Development,
0-0 - Doors for mechanical rooms and radio room?
El-01 • Oil tank room. It says; Sec part plan below, w }crc is it?
- Suction pumps to be install^ above the floodi ig waui table.
Do you have this infonnatioa?
S-1 - Fuel Oil tank is located between column line 7) & 73, not between
64 & 67 as shown on this drawing.
- Platforms are going to be required for water pu up and F.O. pumps.
S-3 - Movable partition. Beam is W8 x 31; but dcUii I says W18 x 31.
NYC-WTC_000173534
OCR can misread numbers and units. Confirm readings against the page image before using them.