Mayor’s Office of Emergency Management
7 World Trade Center
Manhattan
Project #96-1346
Review of Final Plans
Architectural Issues
DRAWING COMMENT
A-EG-23 - Maximum travel distance 300 ft. Could 2”“* egress from PIU be through
the elevator lobby? It would require change in doors.
A-1-1 - How the P.O. tank can be rigged into place?
- There is no room around tank for piping coimection, inspections, etc.
- How can light fixtures be reached for maintenance?
A-7-1 - Is it permitted to open the double doors into the exit corridor?
- Detail of door and curb at mechanical rooms.
- Correspondence between door # and door type, (general).
- Are we having any heating or A/C at these rooms?
- If type 2 partition is for mechanical rooms (2 hr.), why do we
have type 3 here?
A-23-1 - Mechanical rooms should have type 2 partitions (see dwg. D-0).
Why do we have 4 hr. rated ones?
- Why do we have a base under file cabinets? (Detail 15/D-9).
- Why do we have so many partitions type 2 in other than
mechanical rooms? This is a fully sprinklered floor.
- Why not every wall at room 23-10 is sound and EMI resistant? Type 12.
- Why not every wall at Mayor’s Conference room is bullet resistant?
- Lounge and repro rooms should have type 1A partition.
- It was requested some kind of wall treatment for the long corridor
at North side.
- Is the pre-action equipment in an enclosed room?
NYC-WTC_000167814
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000167814Source: NYC Law Department, mirrored locally
Letter from the Division of Real Estate Service notifying the Mayor's Office of Emergency Management that final plans for 7 World Trade Center have been reviewed.
2 shared non-person entities · Same agency, volume and box · similarity 0.988
Letter from DCAS Real Estate Services to a contractor regarding proposals for work at the Mayor's Office of Emergency Management in 7 World Trade Center.
3 shared non-person entities · Same agency, volume and box · similarity 0.946
Urgent memorandum from the Mayor's Office of Emergency Management requesting completion of fiber optic press feed and A/V equipment at 7 World Trade Center.
Department of Citywide Administrative Services requests proposed cost reductions for specific work items at the Mayor's Office of Emergency Management.
2 shared non-person entities · Same agency, volume and box · similarity 0.939
Letter from the Division of Real Estate Service notifying the Mayor's Office of Emergency Management that final plans for 7 World Trade Center have been reviewed.
Letter from the Division of Real Estate Service notifying the Mayor's Office of Emergency Management that final plans for 7 World Trade Center have been reviewed.
Letter from DCAS Real Estate Services to a contractor regarding proposals for work at the Mayor's Office of Emergency Management in 7 World Trade Center.