machine-extracted · confidence unavailable · Check page ↗DCAS letter requesting plan revisions, 7 WTC, April 1998
Machine-extracted title · confidence 95%Letter from DCAS reviewing Final Plans for the Mayor's Office of Emergency Management renovation and requesting consultant revisions.
NYC-WTC_000167813–000167816Folder label: “Mayor's Office of Emergency Management 7 World Trade Center 7th & 23rd floors®New York, New York ®Project # 96-1346”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
April 20, 1998
Mayor’s Office of Emergency Management 7 World Trade Center Manhattan Project #96-1346 Review of Final Plans Architectural Issues
DRAWING COMMENT
A-EG-23 - Maximum travel distance 300 ft. Could 2”“* egress from PIU be through the elevator lobby? It would require change in doors.
A-1-1 - How the P.O. tank can be rigged into place? - There is no room around tank for piping coimection, inspections, etc. - How can light fixtures be reached for maintenance?
A-7-1 - Is it permitted to open the double doors into the exit corridor? - Detail of door and curb at mechanical rooms. - Correspondence between door # and door type, (general). - Are we having any heating or A/C at these rooms? - If type 2 partition is for mechanical rooms (2 hr.), why do we have type 3 here?
A-23-1 - Mechanical rooms should have type 2 partitions (see dwg. D-0). Why do we have 4 hr. rated ones? - Why do we have a base under file cabinets? (Detail 15/D-9). - Why do we have so many partitions type 2 in other than mechanical rooms? This is a fully sprinklered floor. - Why not every wall at room 23-10 is sound and EMI resistant? Type 12. - Why not every wall at Mayor’s Conference room is bullet resistant? - Lounge and repro rooms should have type 1A partition. - It was requested some kind of wall treatment for the long corridor at North side. - Is the pre-action equipment in an enclosed room?
NYC-WTC_000167814
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000169713
Technical review notes on final construction plans for 7 World Trade Center addressing travel distances and mechanical room details.
1 shared topics · Same agency, volume and box · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173018
Letter from DCAS Real Estate Services to a contractor regarding proposals for work at the Mayor's Office of Emergency Management in 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173495
Urgent fax from the Mayor's Office of Emergency Management detailing required fiber optic and A/V equipment installation at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173014
Memo requesting completion of fiber optic press feed and A/V equipment installation on the 23rd floor in March 1999.
1 shared topics · Same agency, volume and box · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173489
Urgent memorandum from the Mayor's Office of Emergency Management requesting completion of fiber optic press feed and A/V equipment at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173030
Letter from DCAS Real Estate Services to a contractor regarding proposals for the Mayor's Office of Emergency Management renovation project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173390
Department of Citywide Administrative Services requests proposed cost reductions for specific work items at the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167310
Letter from DCAS requesting proposed cost reductions for work items in the Mayor's Office of Emergency Management project.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167792
DCAS requests clarifications on itemized costs for the Mayor's Office of Emergency Management renovation at 7 World Trade Center.
3 shared non-person entities · Same agency, volume and box · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173360
Department of Citywide Administrative Services requests specific clarifications and confirmations for itemized costs in a bid package for 7 World Trade Center.
3 shared non-person entities · Same agency, volume and box · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
Technical review notes on final construction plans for 7 World Trade Center addressing travel distances and mechanical room details.
Similar indexed content
NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
Similar indexed content
NYC-WTC_000173018
Letter from DCAS Real Estate Services to a contractor regarding proposals for work at the Mayor's Office of Emergency Management in 7 World Trade Center.
Similar indexed content
NYC-WTC_000173495
Urgent fax from the Mayor's Office of Emergency Management detailing required fiber optic and A/V equipment installation at 7 World Trade Center.
Similar indexed content