A-23-2 - Soffit details need dimensions.
- Ceiling tiles at bunk bathrooms should be water resistant.
- Room 23-15 should have a combination of 2’x 4’ fixtures and
down light.
A-23-5 - Why do we have broadloom carpet at offices if it is the same carpet
than tiles?
- Maybe we should have another type of carpet for rooms 23-04;
23-07; 23-10; and 23-15.
- Shouldn’t the Mayor’s elevator lobby have a better rubber floor?
Maybe a pattern?
A-48-1 - Detail 9. No dimension for concrete base.
- Room dimensions?
- No steps at the door? Curb is 1 ’- 3” min. plus flushing.
- Antenna dishes should be located.
BFI -To show stations at the podium.
- All furniture shall be identified, regardless of the vendor (i.e. chairs,
desks, beds, couches, etc.).
- Mayor’s office should have the best furniture in this project, not this
standard station. This was requested at Design Development.
D-0 - Doors for mechanical rooms and radio room?
El-01 - Oil tank room. It says: See part plan below, where is it?
- Suction pumps to be installed above the flooding water table.
Do you have this information?
S-1 - Fuel Oil tank is located between column line 70 & 73, not between
64 & 67 as shown on this drawing.
- Platforms are going to be required for water pump and F.O. pumps.
S-3 - Movable partition. Beam is W8 x 31; but detail 1 says W18 x 31.
NYC-WTC_000167815