-2-
A-23-2 - Soffit details need dimensions.
- Ceiling files « bunk bathrooms should be w ter resistant
- Room 23’15 should have a combination of 2 x 4’ fixtures and
down light
A-23-5 - Why do we have broadloom carpet at offices if it is the same carpet
than tiles?
- Maybe we should have another type of carpe for rooms 23-04;
23-07; 23-10; and 23-15.
- Shouldn’t the Mayor’s elevator lobby have a setter rubber floor?
Maybe a pattern?
A-48-1 - Detail 9, No dimension for concrete base.
' Room dimensions?
’ No steps at the door? Curb is 1’* 3" min. plm flushing.
- Antenna dishes should be located.
BFI - To show stations at the podium.
- AU furniture shall be identified, regardless of i he vendor (i.e. chairs,
desks, beds, couches, etc.).
- Mayor’s office should have the best furniture i a this project, not this
standard station. This was requested at Desigr Devdoptnent.
n-0 - Doors for mechanical rooms and radio room?
El-01 > Oil tank room It says: See part plan below, w lerc is it?
• Suction pumps to be install^ above the flooding water table.
Do you have this infonnation?
S-1 - Fuel Oil tank is located between column line 7) & 73, not between
64 & 67 as shown on this drawing.
- Platforms are going to be required for water pu np and F.O. pumps.
S-3 . Movable partition. Beam ts W8x 31; but detail I saysWlSx31.