1 shared topics · Same agency, volume and box · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗Plan Review Comments for 7 World Trade Center, Apr 1998
Machine-extracted title · confidence 95%Technical review notes on final construction plans for 7 World Trade Center addressing travel distances and mechanical room details.
NYC-WTC_000169713–000169715Folder label: “Review of Final Plans®Architectural Issues”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
r. UM
April 20 1998
Mayor’s Office of Emcjrgency Management 7 WorW Trade Center Manhattan Project #%-134d Rgvicw of Ftaal PUns Architectttraj Issues
DRAWING COMMENT
A-EG-23 - Maximum travel distance 300 ft- Could 2^ cj ress from PIU be through the elevator lobby? It -would require change i i doors.
A-1-1 - How the P.O. tank can be rigged into place? - There is no room around tank for piping conn xdiom inspections, etc. - How can light fixtures be reached for maiotex ance?
A-7-1 - Is it pennitted to open the double doors into ti ic exit corridor? - Detail of door and curb at mechanical rooms. - Correspondence between door # and door typ(general). - Are we having any heating or A/C at these rw ms? - If type 2 partition is for mechanical rooms (2 ] u.), why do we have type 3 here?
A-23-1 - Mechanical rooms should have type 2 partifio is (see dwg. D-0). Why do we have 4 hr, rated ones? • Why do we have a base under file cabinets? (I detail 15/D-9). - Why do we have so many partitions type 2 in Jthcr than mechanical rooms? This is a fully qjrinkletw floor. - Why not every wall at room 2340 is sound at d EMI resistant? Type 12. - Why not every wall at Mayor’s Conference ro >m is bullet resistant? - Lounge and repro rooms should have type IA partition, «Il was requested some kind of wall trcamicnt f sr the long corridor at North side. - Is the pre-acdon equipment in an enclosed roo n?
NYC-WTC_000169713
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000167813
Letter from DCAS reviewing Final Plans for the Mayor's Office of Emergency Management renovation and requesting consultant revisions.
1 shared topics · Same agency, volume and box · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173018
Letter from DCAS Real Estate Services to a contractor regarding proposals for work at the Mayor's Office of Emergency Management in 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000174100
Site inspection punch list for the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management, compiled following inspections on June 22-23, 1999.
1 shared topics · Same agency, volume and box · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173500
Comprehensive punch list compiled by the Mayor's Office of Emergency Management following site inspections of the 23rd floor at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171707
Inspection report listing required repairs for the 23rd floor of 7 World Trade Center prepared by Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173030
Letter from DCAS Real Estate Services to a contractor regarding proposals for the Mayor's Office of Emergency Management renovation project.
1 shared topics · Same agency, volume and box · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173014
Memo requesting completion of fiber optic press feed and A/V equipment installation on the 23rd floor in March 1999.
1 shared topics · Same agency, volume and box · similarity 0.922
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173012
Detailed inspection report listing required repairs for doors, sprinklers, and electrical fixtures in the Mayor's Office.
1 shared topics · Same agency, volume and box · similarity 0.922
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173475
Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.921
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173489
Urgent memorandum from the Mayor's Office of Emergency Management requesting completion of fiber optic press feed and A/V equipment at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
NYC-WTC_000167813
Letter from DCAS reviewing Final Plans for the Mayor's Office of Emergency Management renovation and requesting consultant revisions.
Similar indexed content
NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
Similar indexed content
NYC-WTC_000173018
Letter from DCAS Real Estate Services to a contractor regarding proposals for work at the Mayor's Office of Emergency Management in 7 World Trade Center.
Similar indexed content
NYC-WTC_000174100
Site inspection punch list for the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management, compiled following inspections on June 22-23, 1999.
Similar indexed content