NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/7 WTC Punch List
Document / 5 pages

OEM fax regarding 7 WTC fiber optic installation, Mar 1999

Machine-extracted title · confidence 98%

Urgent fax from the Mayor's Office of Emergency Management detailing required fiber optic and A/V equipment installation at 7 World Trade Center.

NYC-WTC_000173495–000173499

Folder label: “7 WTC Punch List

Page image
Scanned page image, NYC-WTC_000173496
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

MRR 18 ’99 11:39 FR RMBASSRDOR CONSTR. C0212 949 9762 TO 6693640 P.03/06

MRR-lO-iggg 10;24 OFFICE OF EMERGENCY MGMT 1 212 442 8085 p.03/06 March 9,1999

Plumbing: • Fix the automatic hot wafer dispenser (from leaking upon usage) in the cafeteria. Check to assure the unit is working property in the Mayor's pantry. / Complete installation of ail fixtures in the ADA bathroom (adjacent to the press VT room) and assure the functionality of the facility. Test and assure the operation of the circulator pump from the twenty-third floor to the seventh floor 11,000 gallon water storage bank. CphtpleYf

erratic dimate control throughout the 23”* floor. m p/®TC Electrical:

• Complete the seventh floor switch gear, generator installation and operability of the emergency backup system. Test ran the generators under load and test ATS (automatic transfer switches). u>teiA/d) I'SSoe- ReSofoeb — • Complete conduit work tor completion of A/V press feed on first floor. • inspect and correct numerous light outages and defective ballast in the hallways and Mayor's Conferenre room. Co w pitTF

Carpontiys * ‘ install door-stops to limit the opening of doors and reduce fte number of door handles penetr^g the sheetrock walls. Ct> hiplcTc

• install door opening and closing devices to Omit the "whipping' action of doors located in the fblioM^ areas: 1. Mayor's Suite entrance CompleTp- 2. Director's Conference Room 3. Watch Command entrance from the EOC. 4. Room 23-17 • Complete thirteen “Martite panels' in the EOC. « Complete installation of three additional data faceplates in the Mayor's Conference tabks. Items were ordered (anticipated two to four week delivefy.) Q-k.

Construction; Complete the installation of the fuel line from 1** floor to 7** floor.

NYC-WTC_000173496

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173496Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

23rd floor punch list, 7 WTC, June 1999 · Box 7DCAS

NYC-WTC_000173500

Comprehensive punch list compiled by the Mayor's Office of Emergency Management following site inspections of the 23rd floor at 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.936

machine-extracted · confidence unavailable · Check page ↗
RFI and fax log records, 1995 · Box 7DCAS

NYC-WTC_000166730

Log entries recording received faxes and requests for information related to the 7 World Trade Center project in 1995.

1 shared non-person entities · Same agency, volume and box · similarity 0.931

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.