Seif Room
=> Needs molding around door.
=> Door needs closer.
» Switch face plate does not cover hole in wall.
Entrance to E: aye Suite
9 Plastic bags over exit signals need to be removed. 0* ‘
=> Air-conditioner in executive suite needs to be balanced. ComplOT
Chief of Staff iS
Hole in wall (right hand side of entrance). "DoHC
Diraetora Offiea
Door stop for closet door. *
=> Ceiling tile replaced in closet. Don<
Sprinkler head cover needed in closet. TOO n 6.
=• Electrical box cover on north wall. '^oruL
=> Pin in door closer to prevent bathroom door from opening to far into sink. PI o n DA V-
=> Covers for sprinkler heads in bathroom and bathroom closet. Dori (r
Sprinkler cover in coffee pantry. Dones
9 Bathroom door (inside) needs molding or caulking around frame.
Deputy Director's •LiC-e
=> Sprinkler head does not line up with hole in ceiling. Also missing cover. *Don<r
JuiSS
as Cover for sprinkler system over secretary desk.
=1» Air system needs to be balanced. Done
» Wall switch near AV room does not cover hole in wall, -
=> Tape over door handles and paint removed from handle.
=> Locks missing from secretary desk (never Installed).
=? Door closer for door to Mayor’s Office. Tue^OAV-
Stop also needs to be in place.
=> Sprinkler head not lined up with hole in ceiling in closet in Mayor’s bathroom.
=> Light fixture (right side) missing over sink in bathroom, 3)o
Entrance Door to Mavoral Suite
=> Needs hole in floor for pin lock with sleeve (non-active door). 4^ chpc
Mayorga Confarence RAIWUJ
=> Ceiling light is blinking. WOWbA*/
=:> Shenes should be "blackout" not "solar".
'b<utA. AjM
Cy4«a. feif.