NYC 9/11 Public Portal Document
Executive Conference Room
A. Ceiling: No problems found A - D
B. Walls:
C. Flooring:
D. Electrical:
E. Mise:
1) Wood door missing silencers.
• Mayor’s Reception Area
A. Ceiling:
1) Reset ceiling tiles.
B. Walls:
1) Spackle / paint around light switch plate ( doorway to A / V Room ).
C. Flooring: No problems found C - D
D. Electrical:
E. Mise:
1) Missing floor mounted door stop
MayorlsOflice
A. Ceiling:
1) Spackle / paint ceiling around sprinkler head (outside restroom).
2) Readjust height of sprinkler head (over couch).
B. Walls:
1) Spackle / paint wall to right of doorway to conference room.
C. Flooring: No problems found C - D
D. Electrical:
E. Mise:
1) Scratch in wood veneer entry door ( from reception area into suite ).
25
NYC-WTC_000173524
OCR can misread numbers and units. Confirm readings against the page image before using them.