OEM memo regarding 7 WTC fiber optic installation, Mar 1999

Machine-extracted title · confidence 98%

Urgent memorandum from the Mayor's Office of Emergency Management requesting completion of fiber optic press feed and A/V equipment at 7 World Trade Center.

NYC-WTC_000173489–000173493

Folder label: “7 WTC Punch List”

Page image
Scanned page image, NYC-WTC_000173490
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

mR-10-1999 10.-24 OFFICE OF ENERGENCY MGMT 1 212 442 seas P.03/06 March 9,1999

plumbing] in the cateterla. Check to assuM the unit is w©rking'property4rrfr»4i4aye<i&pactfry. « VAAlipiUlB JJiaiaU$|llUH,^UIj9I!AUUM>J8S jll .UW* rw** kw ula j/i— room) and ninui'O the funotionality of thefanility Test and assure the operation of I the circulator pump from the twenty-third floor to the seventh floor 11,000 gallon ix » water storage tank. -J CM

• Correct erratic climate control throughout the 23"* floor. Electrical! X • Complete the seventh floor switch gear, generator installation and operability of \ OJo emergency backup system. Test run the generators under load and test ATS-^^ Y (automatic transfer switches). vX* Complete conduit work Ibr completion of A/V press feed on first floor. * \ • Inspect and correct numerous light outages and defective ballast in the hallways ? and Mayor’s Conference room. Carpentry] •/install door-stops to limit the opening of doors and reduce tfie number of door handles penetrating the sheetrock wails. • Install door opening and closing devices to limit the “whipping” action of doors located in the following areas: 1. Mayor's Suite entrance 2. Director’s Conference Room 3, Watch Command entrance from the EOC. 4. Room 23-17 VZ* Complete thirteen “Marlite panels" in the EOC. - 3\A\ ^ • Complete Installation of three additional data faceplates in the Mayor’s f Conference table. Items were ordered (anticipated two to four week delivery.)

istructlon: Complete the installation of the fuel line from 1* floor to 7*_ floor.

• Pag* 2

NYC-WTC_000173490

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173490Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Punch list for Mayor's Office, March 1999 · Box 7DCAS

NYC-WTC_000173012

Detailed inspection report listing required repairs for doors, sprinklers, and electrical fixtures in the Mayor's Office.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.965

machine-extracted · confidence unavailable · Check page ↗
23rd floor punch list, 7 WTC, June 1999 · Box 7DCAS

NYC-WTC_000173500

Comprehensive punch list compiled by the Mayor's Office of Emergency Management following site inspections of the 23rd floor at 7 World Trade Center.

2 shared non-person entities · Same agency, volume and box · similarity 0.928

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →